Skip to content
Aperlena

Energy Efficiency Measures

Awarded Contract award No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

  1. Published
  2. Awarded

Description

Delivery of Energy Efficiency Measures to MLs stock located in the Wirral area, the Works required will include -Design and Installation of External Wall Insulation (EWI) -Design and Installation of Cavity Wall Insulation (CWI) performance specification documents, including enabling Works. Extraction of exiting cavities may be required -Design and Installation of Mounted Solar PV with/without battery -Design and Installation of Air Source Heat Pumps (ASHP) performance specification documents, including enabling Works -Loft Insulation including loft insulation top up. -Full roofing renewal -Replacement of light bulbs with low energy bulbs -Where applicable based upon the measures required ventilation upgrades maybe required and additional works to meet the requirement of PAS.

Official source

Source: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Always verify details on the official notice.

Last verified against Find a Tender Service (UK Cabinet Office / Crown Commercial Service) 1 month ago

Documents on Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (English)

More from this buyer

Full buyer profile

Recent awards

Similar tenders

Market context

Buyer track record on Aperlena
7 notices tracked · 6 awarded

Never miss a tender like this

Get an email for new tenders matching: United Kingdom. Free.

Set up my alert