Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 day ago Contract notice

Germany - Wall cladding works - Dry construction works, extension of all-day care, JFK and Saalburg schools

Original Deutschland - Wandverkleidungsarbeiten - Trockenbauarbeiten, Erweiterung Ganztag JFK+Saalburgschule

Closed Germany Darmstadt Construction work

Buyer Wetteraukreis

Key facts

Closed
09:00 (UTC+2)
Procedure
Open procedure
  1. Published
  2. Deadline open for 30 days
  3. Awarded pending
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

Wetteraukreis procured dry construction works, including wall cladding, for the extension of all-day care at the John F. Kennedy School and Saalburg School at Saalburgstrasse 10, 61118 Bad Vilbel. The project is a new three-storey flat-roof extension building of about 30 m by 30 m, adding a canteen for the primary school and extra classrooms and care rooms for the secondary school. Interior wall works were scheduled for calendar weeks 9 to 36 of 2027 and suspended ceiling works for calendar weeks 2 to 20 of 2028. The bidding deadline was 24 September 2026, and the procedure is now closed.

Description

Trockenbauarbeiten im Rahmen der Erweiterung des Ganztagsangebots für die John-F.-Kennedy-Schule und Saalburgschule, Saalburgstraße 10, 61118 Bad Vilbel Ausführungszeitraum Innenwände: KW 9/2027 bis KW 36/2027 Ausführungszeitraum Abhangdecke: KW 2/2028 bis KW 20/2028 Allgemeine Baubeschreibung: Im Zuge des Ausbaues der Ganztagsbetreuung an der Saalburgschule benötigt die Grundschule eine eigene Mensa. Aufgrund steigender Schülerzahlen benötigt die Real- und Hauptschule (John-F.-Kennedy-Schule) weitere Klassen- und Betreuungsräume. Der Schulcampus in Bad Vilbel ist flächenmäßig eng genutzt, deshalb soll ein gemeinsamer Erweiterungsbau an die John-F.-Kennedy-Schule beide Bedarfe decken. Das neue Erweiterungsgebäude soll an der nordwestlichen Grundstücksecke gebaut werden. Zwischen dem Baufeld und der bestehenden Sporthalle im Osten ist ein Streifen mit einem dichtgewachsenen Baumbestand. Die Baumschutz und die Wurzelschutzmassnahmen werden bauseits ausgeführt. Bei der Ausführung ist darauf Rücksicht zu nehmen. Die Zu- und Abfahrt für den Baustellenverkehr erfolgt im Norden vom Massenheimer Weg aus. Hier wird ab der Feuerwehrzufahrt der Saalburgschule der Verkehr gesperrt und eine Sackgasse ausgebildet. Die Beschilderung erfolgt bauseits. Die Baueinrichtungsfläche und der Kran sollen im Norden des Baufeldes aufgestellt werden. Der Neubau ist mit 3 aufgehenden Vollgeschossen mit Flachdach und den Abmessungen von ca. 30m x 30m geplant. Aufgrund der geneigten Geländesituation ist im südlichen Bereich ein Teiluntergeschoss geplant, dass auch einen ebenerdigen Zugang von der bestehenden JFK-Schule ermöglicht. Die Erschliessung der Saalburgschule ist im EG über eine großzügige Treppenanlage vom bestehenden Pausenhof aus geplant. Für die Technikzentrale Lüftung wird im Dachgeschoss ein weiteres Staffelgeschoss mit einem Walmdach mit einer Holzkonstruktion ausgeführt. Gewerke-Beschreibung: Hiermit sollen die Trockenbauarbeiten vergeben werden, diese sind im Einzelnen Trockenbauarbeiten für die Innenwände und die Abhangdecke im Rahmen des Innenausbaus des bezeichneten Erweiterungsneubaus. Direkt nach dem Einbau der Fenster sollen die Trockenbauarbeiten beginnen, mit der Stellung der Profile sowie einseitiger Beplankung. Nach Abstimmung mit der Bauleitung können Teilbereiche direkt zweiseitig geschlossen werden, insbesondere die Flurwände mit F30/F90 Anforderungen. Die Installationen laufen alle in einer Vorsatzwand. Nach Fertigstellung der Wandinstallation können die Trockenbauwände geschlossen werden. Die Abhangdecke wird in der Fläche als Rasterdecke ausgeführt und in den Schrankzonen sowie im Sturzbereich als GK-Decke. Ausführung der UK für die Rasterdecke ist nach Fertigstellung der Estricharbeiten geplant. Die Einlegearbeiten der Abhangdecke erfolgen dann nach Abstimmung mit der Bauleitung im Zuge des Baufortschrittes. Die Wandabsorber werden erst nach Fertigstellung der Malerarbeiten an den Wänden montiert.

Terms of the procedure

How tenders are scored
Preis: 100 percent
Small firms
The buyer does not mark this procedure as suitable for small and medium-sized firms.

As the official notice states them.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

Wetteraukreis

Germany

notices in the register
93
awards
34
awarded in total
€4.1M

Who wins its contracts

Many suppliers
different companies won its awards
28
of the awards went to the three most frequent winners
19%
of its calls state an estimated value
0%

Based on 31 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
6.5
of those lots received a single tender
6%
of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Awards most often to

  1. gsm GmbH 2 awards €648,720
  2. Bildungswerk der Hessischen Wirtschaft e.V. 2 awards €472,610
  3. ASP Architekten LEIPERT PFEIFF PartGmbB 2 awards

5 open tenders right now

Market context

open now in Construction work
19,935
median open notice
€547,553

Who wins in this market

Many suppliers

Germany · Construction work

different companies won awards here
12,328
of the awards went to the three most frequent winners
1%
buyers awarded contracts here
2,985

Based on 27,178 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
6.3
of those lots received a single tender
7%
of the awards went to companies based in another country
1%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

1,815 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Wall-covering work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language