The Aperlena Verdict
Narrow fieldSiemens Mobility GmbH leads with 45.5% of the last 167 comparable contracts, but 18 different suppliers have won here in 5 years. Worth a serious look.
Based on 167 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryA German contracting authority is procuring a framework contract for the development, manufacture and delivery of up to 20 production-ready multisensory inspection trains. The vehicles must be complete, functional, approved and fit for safe operation, carry at least 8 staff, reach 200 km/h under overhead line power, and be equipped with ETCS, PZB, LZB, GSM-R and FRMCS readiness. They must perform rail flaw detection (ultrasonic, eddy current), track geometry and rail profile measurement, and track superstructure inspection. The contract also covers maintenance services, full vehicle documentation, spare parts supply and special tools.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile532 open tenders right now
- Railway bridge construction - ABS Leipzig - Dresden, replacement bridge Neu-Medessen including replacement feeding Priestewitz 1 day left
- Installation of electrical systems - ESTW Bonn-Bad Godesberg | TK tender lots 1-3 1 day left
- Railway track construction works - Track renewal with damage threshold replacement Grafrath - Buchenau line; 5520 1 day left
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Siemens Mobility GmbH | 76 | n/a | Sep 2026 |
| Hitachi Rail GTS Deutschland GmbH | 59 | €658,193 | Sep 2026 |
| Scheidt & Bachmann System Technik G | 9 | n/a | Sep 2026 |
| DB Bahnbau Gruppe GmbH | 5 | n/a | Jun 2026 |
| Scheidt & Bachmann Signalling - Systems GmbH | 4 | n/a | May 2026 |
Based on 167 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 10 comparable contracts this buyer awarded in this sector over the last 4 years.
- €1
- Lower quartile
- €75,951
- Median award
- €605,508
- Upper quartile
Most recent awards
- Ausrüstung für die Eisenbahnverkehrssteuerung - Lieferung 649 Stück Material 1142992 Einsatz,Elektronik-(380km/h)f Zp 30C-NT SEL*3CR 01809 ACAD
- Eisenbahnmaterial - Herstellung/Lieferung Kondensatoren zur Herstellung von Gleismagneten inkl. Transport ohne Entladung €1,814,400
- Mechanische Signaleinrichtungen - SpDrL60, Erstellung PT2 für Stellwerk + Montage für BÜ Seebeckstraße km 163,037 Strecke 1740 €151,900
- Ausrüstung für die Eisenbahnverkehrssteuerung - Schleiffeder f Motorzählwerk SIEM*C25232-A6-C5
- Schienengebundene Instandhaltungs- oder Arbeitswagen und Güterwagen - Beschaffung von 12 Gleisbauanhängern
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Similar tenders
1
day left
€525,000
est. value
Market context
- Avg. open tender · Transport equipment & vehicles
- €28,402,389
- Buyer track record on Aperlena
- 3,823 notices tracked · 2,731 awarded
- €2,690,235,176 in awarded contracts
Never miss a tender like this
155 new notices in Transport equipment & vehicles in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alert