Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 day ago Contract notice

Germany - Petroleum products, fuel, electricity and other energy sources - Procurement of electricity for the building stock of GWC GmbH 19.10.2026

Original Deutschland - Mineralölerzeugnisse, Brennstoff, Elektrizität und andere Energiequellen - Beschaffung von Strom für den Gebäudebestand der GWC GmbH 19.10.2026

Open Germany Brandenburg Petroleum, fuel & energy

Buyer Gebäudewirtschaft Cottbus GmbH

7 days left

Key facts

Closes
09:00 (UTC+2)
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 28 days
  4. Awarded pending

Bidding window

28 days from publication to deadline

Usual length

Notices of this kind (Germany, open procedure, above the EU threshold) give a median of 31 days, half of them between 28 and 34 days, based on 84,922 notices of the last two years.

This buyer usually gives 26 days (median of its last 95 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Summary

Machine-generated summary

GWC GmbH seeks a new energy supply contract to cover its demand for green electricity for the buildings listed in the notice. The supply is divided into 3 lots. Lot 1 covers operating power for district heating service connection stations with 419 supply points and an annual consumption of about 1,277,398 kWh. Lot 2 covers house lighting with 1,334 supply points and an annual consumption of about 2,530,851 kWh. Lot 3 covers administrative buildings, guest, emergency and variable vacant units with 22 supply points and about 166,032 kWh per year. Addresses, connection data and consumption figures are provided in the overview of supply points, and forecast annual quantities may be adjusted for later supply years.

Description

Zur Abdeckung des Bedarfs an Ökostrom benötigt der Auftraggeber einen neuen Energieliefervertrag. Der Auftragsgegenstand ist aufgeteilt in 3 Lose. Der abzuschließende Energieliefervertrag umfasst die Lieferung des gesamten Bedarfs an Ökostrom zur Versorgung der ausgeschriebenen Abnahmestellen. 2.1. Los 1 - Betriebsstrom Fernwärme-Hausanschlussstationen Anzahl der Abnahmestellen: 419 Jahresverbrauch: 1.277.398 kWh Die Anschriften der Abnahmestellen, Anschluss- sowie Verbrauchsdaten können Sie der entsprechenden Übersicht der Abnahmestellen entnehmen. 2.1.1. Informationen zum Verbrauchsverhalten Die prognostizierte Jahresmenge 2027/2028 wird mit ca. 1.277.398 kWh angenommen. Bei Änderungen der Verbrauchsmengen teilt der Auftraggeber dem Auftragnehmer für das Belieferungsjahr 2028/2029 (Optional 2029/2030 bzw. 2030/2031) spätestens mit Beschaffung der Mengen, die prognostizierten Jahresmengen mit. Erfolgt keine geänderte Mitteilung zur prognostizierten Jahresmenge durch den Auftraggeber, ist die Verbrauchsmenge des laufenden Belieferungsjahres beizubehalten. 2.2. Los 2 - Hauslicht Anzahl der Abnahmestellen: 1334 Jahresverbrauch: 2.530.851 kWh Die Anschriften der Abnahmestellen, Anschluss- sowie Verbrauchsdaten können Sie der entsprechenden Übersicht der Abnahmestellen entnehmen. 2.2.1 Informationen zum Verbrauchsverhalten Die prognostizierte Jahresmenge 2028 wird mit ca. 2.530.851 kWh angenommen. Bei Änderungen der Verbrauchsmengen teilt der Auftraggeber dem Auftragnehmer für das Belieferungsjahr 2029 (Optional 2030 bzw. 2031) spätestens mit Beschaffung der Mengen, die prognostizierten Jahresmengen mit. Erfolgt keine geänderte Mitteilung zur prognostizierten Jahresmenge durch den Auftraggeber, ist die Verbrauchsmenge des laufenden Belieferungsjahres beizubehalten. 2.3. Los 3 - Verwaltungsobjekte, Gäste-, Havarie- und variable Anzahl Leerwohnungen Anzahl der Abnahmestellen: 22 Jahresverbrauch: 166.032 kWh Die Anschriften der Abnahmestellen, Anschluss- sowie Verbrauchsdaten können Sie der entsprechenden Übersicht der Abnahmestellen entnehmen

3 lots

Lot 1
Betriebsstrom Fernwärme-Hausanschlussstationen
Lot 2
Hauslicht
Lot 3
Verwaltungsobjekte, Gäste-, Havarie- und variable Anzahl Leerwohnungen
How tenders are scored
Energiekosten Vertragslaufzeit: 70 percent; Energiekosten Verlängerungsoptionen: 10 percent; Symmetrische Mehr-/Mindermengentoleranz: 15 percent; Dienstleistungsentgelt für ausgleichspflichtige Mehr-/Mindermengen: 5 percent
Small firms
The buyer does not mark this procedure as suitable for small and medium-sized firms.

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Petroleum, fuel & energy.

  4. Check this first:

    Is the deadline realistic for a proper offer?

    7 days left, 5 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €374,080 and €2.4M.

  6. Your call:

    Do we know this buyer?

    The buyer has 137 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in German.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 572 awards for Petroleum, fuel & energy in Germany.

Median award
€942,462
Middle half of past awards
€374,080 to €2.4M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Gebäudewirtschaft Cottbus GmbH

Germany

notices in the register
137
awards
23
awarded in total
€535,000

Who wins its contracts

Moderately concentrated
different companies won its awards
7
of the awards went to the three most frequent winners
60%
of its calls state an estimated value
0%

Based on 10 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

This buyer has no award history in this sector yet. Usual winners, Petroleum, fuel & energy - Germany

Company Wins Total awarded Last win
enercity AG 58 €166.1M Oct 2026
ENNI Energie & Umwelt Niederrhein GmbH 36 €40.3M Sep 2026
ZVO Energie GmbH 36 €7.5M Sep 2026
N-ERGIE AG 26 €28.0M Sep 2026
Stadtwerke Augsburg Energie GmbH 25 €42.7M Aug 2026

Based on 1175 awards with a linked company profile over the last 2 years.

3 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Petroleum, fuel & energy
3,668
median open notice
€365,501

Who wins in this market

Many suppliers

Germany · Petroleum, fuel & energy

different companies won awards here
489
of the awards went to the three most frequent winners
11%
buyers awarded contracts here
745

Based on 1,175 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.9
of those lots received a single tender
18%
of the awards went to companies based in another country
1%
of the tenders came from another country
4%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

43 new notices in Petroleum, fuel & energy in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Petroleum products, fuel, electricity and other sources of energy: an email when new tenders arrive under it, no account needed.

7 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language