The Aperlena Verdict
Open raceNo supplier dominates: 27 different companies have won the last 34 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 34 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contract covers the construction of two panoramic lift installations. As part of the vertical access works in Terminal 1, Hall B Mitte, the existing moving walkway installations in the eastern part of axis 500 are to be replaced by panoramic lifts for passenger and forklift operation. Both hydraulic lifts, designed for passenger and freight use, will share a single shaft structure. The lifting height across 4 levels is approximately 16 m. The shaft at levels U01 and E01 will be built in solid construction by others. For levels E02 to E03, a glass and steel shaft is planned and forms part of the works being tendered.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
What this market pays
The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Germany.
- Median award
- €275,813
- Middle half of past awards
- €122,331 to €712,685
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileFraport AG
- notices in the register
- 394
- awards
- 182
- awarded in total
- €121.9M
Who wins its contracts
Many suppliers- different companies won its awards
- 75
- of the awards went to the three most frequent winners
- 13%
- of its calls state an estimated value
- 0%
Based on 100 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- of the awards went to companies based in another country
- 2%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Lauer GmbH | 3 | Feb 2026 | |
| ADB Safegate Germany GmbH | 2 | Jun 2026 | |
| CMS electric GmbH | 2 | Sep 2026 | |
| J.Rehms Gebäudetechnik GmbH | 2 | Feb 2026 | |
| Nohl Brandschutz GmbH | 2 | Jun 2026 |
Based on 34 awards with a linked company profile over the last 5 years.
134 open tenders right now
- Building automation 9 days left
- Maintenance of lifts 2027 16 days left
- Maintenance of Escalators and Moving Walkways 2027 16 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 28,842
- median open notice
- €831,890
Who wins in this market
Many suppliersGermany · Construction work
- different companies won awards here
- 12,726
- of the awards went to the three most frequent winners
- 1%
- buyers awarded contracts here
- 2,969
Based on 26,871 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 6.3
- of those lots received a single tender
- 7%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
30,797 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alert