Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 week ago Contract award

Deutschland - Bauarbeiten für Kraftwerke, Bergbau- und Produktionsanlagen und für Gebäude der Öl- und Gasindustrie - BvA: Kommunale Energieverwertung Schwaben gKU, Klärschlamm-UPCYCLING Anlage, Klärschlammpyrolyseanlage

Awarded Germany Schwaben Construction work

Buyer Kommunale Energieverwertung Schwaben gKU

€4.1M awarded value · €4,115,000

Key facts

Awarded
Procedure
Open procedure
  1. Awarded
  2. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

PYREG GmbH

Awarded value
€4,115,000
Award date
Bids received
2
Record with this buyer
1 first contract from this buyer in the register

Description

Die Kommunale Energieverwertung Schwaben gKU möchte zur nachhaltigen Aufbereitung/Weiterverarbeitung von Klärschlamm (aus den betriebseigenen Kläranlagen) in unmittelbarer Nähe zur Kläranlage in Buchloe eine Produktionshalle inkl. Verwaltungsgebäude zur Klärschlammtrocknung mit Pyrolyse errichten. Gegenstand der Ausschreibung ist die Errichtung einer Klärschlammpyrolyseanlage inkl. Engineering. Zusätzlich werden Inspektion, Wartung und Instandsetzung der Anlage beauftragt. Bei dem Verfahren handelt es sich um ein kontinuierlich arbeitendes, in sich geschlossenes System zur Verwertung von getrocknetem Klärschlamm. Der vorgetrocknete Schlamm wird über eine geeignete Fördertechnik kontrolliert und luftdicht in das System eingespeist. Im Reaktor wird das Material unter weitgehendem Sauerstoffausschluss bei Temperaturen von etwa 500 bis 750 °C thermisch behandelt. Dabei entsteht ein festes Karbonisat, das teils aus verbleibenden organischen Kohlenstoffverbindungen sowie aus mineralischen Bestandteilen besteht. Die stoffliche Verwertung dieses Karbonisats ist eines der Ziele des Verfahrens. Das Karbonisat wird über eine geeignete Fördertechnik aus dem System ausgetragen und kontrolliert abgekühlt, um eine sichere Lagerung zu gewährleisten und das Risiko einer Staubexplosion zu vermeiden. Die Lagerung erfolgt in der Regel in Bigbags, die eine einfache Handhabung und Transport ermöglichen. Zugleich werden bei diesem Prozess organische Schadstoffe - etwa Mikroplastik oder PFAS - zuverlässig zerstört. Die dabei entstehenden brennbaren Gase werden gefiltert und anschließend in einer nachgeschalteten Hochtemperatur-Brennkammer (etwa 950 bis 1050 °C) vollständig und schadstoffarm verbrannt. Die dabei entstehende thermische Energie ist ein Nebenprodukt und kann beispielsweise zur Trocknung von Klärschlamm genutzt werden. Zusätzliche Abgasreinigungsmaßnahmen - wie Staubabscheider, Gaswäscher oder Aktivkohlefilter - sorgen dafür, dass Emissionen wie Staub, Stickoxide (NOx), Schwefeldioxid (SO2) und Schwermetalle wirksam reduziert werden. Ein durchgängiges Unterdrucksystem stellt sicher, dass keine Prozess- oder Abgase unkontrolliert entweichen können. Anforderungen an die Pyrolyse: a. Reaktorsystem: Ausführung als Reaktorsystem mit kontinuierlicher und vollautomatisierter Prozessführung. Batch- oder Semi-Batch-Betrieb sind nicht zulässig. b. Trennung von Pyrolyse und Oxidation: Die Anlage muss eine klare Trennung der Pyrolyse- und Oxidationsprozesse gewährleisten, um eine optimale und regelbare Prozesssteuerung (Temperatur und Verweilzeit) zu ermöglichen. Die Beheizung des Materials muss indirekt erfolgen. c. Wärmerückgewinnung/Energieeffizienz: Nutzung der Abgase aus der Oxidation der Pyrolysegase zur Wärmerückführung in den Reaktor, um den thermischen Energieverbrauch des Gesamtsystems zu minimieren. Eine elektrische Beheizung des Reaktors ist nicht zulässig. d. Steuerung: Die Steuerung erfolgt über ein Automatisierungssystem auf dem neusten Stand der Technik (Siemens SPS S7 1500, oder vergleichbar), zur zuverlässigen und präzisen Steuerung und Regelung der Anlage. e. Gasreinigung: I. Equipment zur Feinstaubabscheidung aus Pyrolysegas und/oder Abgas II. Neutralisation der sauren Bestandteile (z.B. SO2) im Abgas erforderlich. III. Abscheidung von flüchtigen Schwermetallen im Abgas notwendig. im Übrigen werden die Leistungsbeschreibung sowie die Vergabe- und Vertragsunterlagen in Bezug genommen.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

What this buyer has paid before

Based on 6 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€4.1M
Median award
€597,983
Middle half of past awards
€286,998 to €1.1M

The award is larger than three in four past awards.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Kommunale Energieverwertung Schwaben gKU

Germany

notices in the register
32
awards
12
awarded in total
€7.7M

Who wins its contracts

of its calls state an estimated value
0%

Competition

tenders per lot on average (open and restricted procedures)
2.4
of those lots received a single tender
20%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Riedle Ingenieur-Bau GmbH 2 awards €896,001
  2. PYREG GmbH 1 award €4.1M
  3. Baumeister Herbert Maier Bau GmbH 1 award €1.2M

2 open tenders right now

Market context

open now in Construction work
19,897
median open notice
€549,397

Who wins in this market

Many suppliers

Germany · Construction work

different companies won awards here
12,402
of the awards went to the three most frequent winners
1%
buyers awarded contracts here
3,003

Based on 27,432 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
6.3
of those lots received a single tender
7%
of the awards went to companies based in another country
1%
of the tenders came from another country
1%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Award date
    Was: May 11, 2026
    Now: May 11, 2026
    Scope and criteria
    The description was expanded. Re-read it before you bid.

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Open now

Awarded before

Never miss a tender like this

1,685 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language