Summary
Machine-generated summaryThe district of Ahrweiler procured works to restore the riverbed of the Ahr in the municipality of Hoenningen. The riverbed was to be partially widened and ecologically upgraded. In construction section 01, located between the Kapellenstrasse bridge and the bridge under construction downstream in Hoenningen, the main excavation to widen the river's flow profile was carried out, followed by ecological upgrading of the watercourse and bank areas. The section covered about 1,100 m of river. Works included stripping topsoil, layer-by-layer removal of bank areas, separation and temporary storage of excavated material, sampling, transport to a recovery facility, shaping of banks and partial installation of slope and bank reinforcement. Bidding closed with the deadline on 28 September 2026.
Description
Terms of the procedure
- How tenders are scored
- Price
- Small firms
- The buyer does not mark this procedure as suitable for small and medium-sized firms.
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
The buyer
Full buyer profileKreisverwaltung Ahrweiler - Stabsstelle Hochwasserresilienz und Aufbaukoordination
- notices in the register
- 13
- awards
- 2
- awarded in total
- €949,944
Who wins its contracts
- of its calls state an estimated value
- 0%
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Recent awards
1 open tender right now
Market context
- open now in Construction work
- 19,935
- median open notice
- €547,553
Who wins in this market
Many suppliersGermany · Construction work
- different companies won awards here
- 12,328
- of the awards went to the three most frequent winners
- 1%
- buyers awarded contracts here
- 2,985
Based on 27,178 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 6.3
- of those lots received a single tender
- 7%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
1,815 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Excavating and earthmoving work: an email when new tenders arrive under it, no account needed.