Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 6 days ago Contract award

Denmark - Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment - Agreement for the Supply of Spare Parts, Technical Support and Engineering Services

Awarded Denmark Hovedstaden Transport equipment & vehicles

Buyer Metroselskabet I/S

€66.9M awarded value · €66,902,162

Key facts

Published
Procedure
Negotiated procedure
  1. Published
  2. Awarded pending

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish the date of this award. See the official notice

View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

Hitachi Rail STS S.p.A.

Awarded value
€66,902,162
Bid received
1 A single tender
Winner's country
Italy
Record with this buyer
2 contracts from this buyer in the register, €95.0M in total

Summary

Machine-generated summary

Metroselskabet I/S awarded an agreement to Hitachi Rail STS S.p.A. covering spare parts, repairs of spare parts, technical support with strict response times, and remote engineering services for the Copenhagen Metro M1-M4 systems. These systems include passenger vehicles and automatic train control, which only the supplier can service due to technical reasons and exclusive rights. The agreement covers all existing M1-M4 lines, possible future extensions, and interfaces to other transport system elements, supplementing a separately tendered O&M contract. The awarded value was about EUR 66,902,162.28, converted from DKK at the ECB reference rate.

Description

Previously, Metroselskabet I/S (hereafter “Metroselskabet”) tendered out the transportation system contracts for the M1-M4 lines of the Copenhagen Metro. The contracts were awarded to Hitachi Rail STS S.p.A. (hereafter “the Supplier”). Under the contracts, the Supplier has provided a number of systems / assets. These systems / assets include, in particular, passenger vehicles and automatic train control (ATC) (and are hereafter collectively referred to as “the Systems”). The Systems are essential for the operation and functionality of the Copenhagen Metro and are generally characterized by a very high degree of technical complexity and by their reliance on specialized knowledge and insight into the Systems, their coherence, software, etc. on a deeper level. Due to technical reasons and exclusive rights, the Supplier is the only economic operator who is able to supply certain specific spare parts, repairs of spare parts, technical support (on-site and subject to strict response times) and engineering services (remote) related to certain subsystems of the Systems (hereafter “the Deliverables”). Metroselskabet therefore intends to conclude a new agreement with the Supplier covering supply of the Deliverables (hereafter “the Agreement”). The scope of the Agreement encompasses Deliverables for all existing lines (M1-M4), including future extensions to these lines to the extent that the Systems will also be used for such extensions. Further, the scope of the Agreement also includes Deliverables for interfaces from the passenger vehicles and the ATC to other elements of the transportation system. The Agreement shall supplement the contract regarding operation and maintenance of the Copenhagen Metro M1-M4 (hereafter “the O&M Contract”) which has been put out to tender by Metroselskabet, see Contract Notice No. 471641-2025 (and potentially also later O&M contracts). The O&M Contract will include the vast majority of services, parts, etc. required for the metro. As an example, the operator under the O&M Contract will be responsible for the greater part of the fault finding, corrective and preventive maintenance, etc., whereas the Supplier will only be engaged when an issue cannot be resolved by the operator / requires support on higher and more complex maintenance levels. The Agreement is expected to be concluded in the fall of 2025 after which a mobilization period shall commence. The actual commencement of the Agreement will, with certain exceptions, occur when the O&M Contract becomes effective (expected in September 2026). The duration of the Agreement shall be until the 29 September 2032. However, Metroselskabet may extend the Agreement for a total of up to 144 months (that is, until 29 September 2044, at the latest). Further, the Supplier shall be available for providing assistance for a period of up to 6 months after the expiry or termination of the Agreement in order to facilitate the transition to a future scenario where the Deliverables, in whole or in part, are no longer required (due to e.g. the end of life of the Systems).

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 6 days ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 171 awards for Transport equipment & vehicles in Denmark.

This award
€66.9M
Median award
€699,913
Middle half of past awards
€312,008 to €2.4M

The award is larger than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Metroselskabet I/S

Denmark

notices in the register
37
awards
8
awarded in total
€285.3M

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Hitachi Rail STS SpA 2 awards €95.0M
  2. MT Højgaard Danmark A/S 1 award €120.4M
  3. ISS Facility Service A/S 1 award €1.9M

12 open tenders right now

Market context

open now in Transport equipment & vehicles
4,489
median open notice
€230,000

Who wins in this market

Many suppliers

Denmark · Transport equipment & vehicles

different companies won awards here
123
of the awards went to the three most frequent winners
17%
buyers awarded contracts here
91

Based on 193 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
2.5
of those lots received a single tender
20%
of the awards went to companies based in another country
10%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

15 new notices in Transport equipment & vehicles in Denmark in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language