Denmark - Construction work - Copenhagen - New Metroline, M5 Civil Works South

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Metroselskabet is tendering the M5 Civil Works South package, a major construction contract for the expansion of the Copenhagen metro in Denmark. The scope covers approximately 6.5 km of twin bored TBM tunnels, 5 underground stations including 3 transfer stations, 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approximately 2.0 km of viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation and short embankment sections. This Phase 1 tender covers the southern section from north-west of Copenhagen Central Station to north of Prags Boulevard, with operations expected to begin in 2036. Phase 2 is not included. Contractors can bid under the stated procedure; no estimated value or deadline is given in the notice.

Description

This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored TBM tunnels, 5 underground stations (incl. 3 transfer stations), 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approx 2.0 km viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in June 2026) • Operation and Maintenance contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (will be tendered out at a later stage) • Canopy contracts (will be tendered out at a later stage). CONTRACT The contract is structured as a design & build contract under ABT18 terms, placing comprehensive responsibility for both design and execution upon the Contractor. This two-phase approach-design followed by execution-is a standard framework for complex infrastructure projects. A market dialogue has been carried out before issuing the tender. The purpose of the market dialogue was to ensure that the project is attractive to the market, and to ensure competitive and compliant final tenders to be used as basis for the award of contract. Metroselskabet I/S is grateful for the potential tenderers who took their time to participate in the dialogue and provided input. INDICATIVE TIMESCHEDULE FOR THE PROCUREMENT Publication of contract notice September 10th 2026. Publication of tender documentation September 11th 2026. Deadline for submission of application for prequalification October 13th 2026, ref. made to section 5.1.12. Dialogue phase November 2026-October 2027. Final tender November 2027. Award of contract December 2027. The time-schedule may be subject to change.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 5 days ago

More from this buyer

Full buyer profile

18 open tenders right now

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
MT Højgaard Danmark A/S 1 €120.4M Feb 2026
Hitachi Rail STS SpA 1 €28.1M Jan 2026

Based on 2 awards with a linked company profile over the last 5 years.

Similar tenders

Market context

Avg. open tender · Construction work
€32,824,770
31,035 open across Europe right now
Buyer track record on Aperlena
23 notices tracked · 4 awarded
€149,557,214 in awarded contracts

Never miss a tender like this

16 new notices in Construction work in Denmark in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close