Denmark - Partially underground railway works - Copenhagen - New Metroline, M5 Transportation System

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Metroselskabet is procuring the M5 Transportation System South package (TSS) for a new fully automated, driverless metro line in Copenhagen, Denmark. Phase 1 covers the southern section from København H to north of Prags Boulevard, with operation expected to commence in 2036. The contract includes rolling stock, railway infrastructure such as signaling, a control and maintenance center, and O&M supplies, forming a mixed procurement under Article 5(2) of the Utilities Directive. Options cover the northern section, expected operational by 2045. The M5 must operate independently without disrupting lines M1-M4. Contractors interested in this strategically significant project should monitor official tender documents for deadlines, values, and participation requirements.

Description

This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but is also planned to extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. The current tender, Phase 1, encompasses the southern section of the line, from København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes the northern section with an anticipated operatonal commencement of the last part of the northern section in 2045 (included in the transportation system contract (TSS-contract) as options) and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. The procurement comprises the following, together constituting a mixed procurement within the meaning of Article 5 (2) of the Utilities Directive: 1) A TRANSPORTATION SYSTEM for M5 south encompassing the subsystems rolling stock (passenger vehicles, service vehicles and rescue trolleys), railway infrastructure (signaling system and other subsystems, excluding permanent way and power supply "on the line"), and a CMC (control and maintenance center). Furthermore, O&M supplies (supplies related to the O&M providers operation and maintenance activities such as maintenance plans and training). “On the line” refers to deliveries outside the CMC (as the Transportation System Contractor (TSC) is itself responsible for power supply and permanent way within the CMC). The integration of the mentioned TS-subsystems and the integration of the scope of supply of the CWC into the Transportation System (including but not limited to permanent way and power supply on the line) is also part of the TSC's responsibilities and forms part of the TSS-contract. Rolling stock, railway Infrastructure and the CMC are further described in M5-2-TSS-SW (Scope of Work) of the tender material. 2) MAINTENANCE SERVICES following hand over of the Transportation System related to the continued maintenance of the Transportation System (hereinafter Maintenance Services). The TSS-contract covers both the Transportation System and the Maintenance Services. The Maintenance Services are governed by a separate maintenance contract forming an attachment to the TSS-contract (hereinafter Maintenance Contract) The purchase of the Transportation System and the Maintenance Services should therefore be seen as a whole and only one Tenderer will be awarded the contracts. The expected scope and characteristics of the two contracts are described in the tender material. 3) OPTIONS Three (3) options are included in the TSS-contract: Option 1: The purchase of 5 additional passenger vehicles. Option 2: The extension of the transportation system from Prags Boulevard to Refshaleøen. Option 3: The extension of the transportation system from Refshaleøen to Lynetteholm. Metroselskabet’s requirements relating to the Transportation System are set out in the tender documents, including the draft TSS-contract and the Scope of Works document (M5-2-TSS.SW). Requirements may be developed and changed during the competitive dialogue. As regards the Maintenance Contract, no draft contract or draft specifications are included in the Tender Documents at this stage. This reflects the fact that a central element of the competitive dialogue will be to explore the scope and structure of the Maintenance Contract, including the distribution of maintenance tasks between the TS Contractor and the future operator of the Transportation System (hereinafter the OAMC). As a central element of the dialogue phase, the Employer wishes to explore the advantages and implications of possible distributions of maintenance tasks between the TS Contractor and the OAMC and the technical, commercial and legal terms that will be relevant depending on the maintenance model chosen. The potential models to be discussed and assessed during the dialogue phase are expected to span from a scope of the Maintenance Contract similar to TSSSA models (“Technical Support and Spares Supply Agreements”) to a scope similar to FSA models (“Full Service Agreements”) whereby the Employer would procure most goods, works and services needed for the maintenance and continued development of the Transportation System from the TS Contractor. However, also models which are “in between” or a model where the scope will change over time may be chosen. Also the options to purchase additional passenger vehicles and options covering the extension of the line (northern section) are subject to dialogue. Both technical and commercial requirements are expected to be discussed including elements related to pricing. For further detailing of items planned to be subject for dialogue, reference is made to the Instructions to Tenderers (M5-0-TSS-ITT). Reference is made to section 2.1 of this contract notice

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

18 open tenders right now

Who usually wins this buyer's contracts in this sector

Company Wins Total awarded Last win
MT Højgaard Danmark A/S 1 €120.4M Feb 2026
Hitachi Rail STS SpA 1 €28.1M Jan 2026

Based on 2 awards with a linked company profile over the last 5 years.

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Read before bidding
    • Estimated value: Set to €550,000,000
    • Scope and criteria: The description was expanded. Re-read it before you bid.
    • Estimated value: Set to €550,000,000

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Market context

Avg. open tender · Construction work
€32,560,951
31,108 open across Europe right now
Buyer track record on Aperlena
23 notices tracked · 4 awarded
€149,557,214 in awarded contracts

Never miss a tender like this

16 new notices in Construction work in Denmark in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close