Danemark - Travaux de construction - Copenhague - Nouvelle ligne de métro, M5 génie civil Sud

Original Denmark - Construction work - Copenhagen - New Metroline, M5 Civil Works South

Ouvert Avis de marché Aucune date limite publiée
Suivre ce marché

Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit. Se connecter

Résumé

Résumé généré automatiquement

Metroselskabet lance un appel d'offres pour le lot M5 génie civil Sud (Civil Works South), un contrat de construction majeur pour l'extension du métro de Copenhague, au Danemark. Le périmètre comprend environ 6,5 km de tunnels jumeaux forés au TBM, 5 stations souterraines dont 3 de correspondance, 2 crossovers souterrains, 1 puits, 5 galeries transversales, 1 rampe, environ 2,0 km de viaduc, 1 station aérienne, 1 crossover de viaduc, 1 bifurcation aérienne et de courts remblais. Cette consultation (phase 1) concerne la section sud, du nord-ouest de la gare de Copenhague H jusqu'au nord de Prags Boulevard, avec une mise en service prévue en 2036. La phase 2 n'est pas incluse. Les entreprises peuvent soumissionner selon la procédure indiquée; valeur estimée et date limite ne sont pas précisées dans l'avis.

Description

This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored TBM tunnels, 5 underground stations (incl. 3 transfer stations), 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approx 2.0 km viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in June 2026) • Operation and Maintenance contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (will be tendered out at a later stage) • Canopy contracts (will be tendered out at a later stage). CONTRACT The contract is structured as a design & build contract under ABT18 terms, placing comprehensive responsibility for both design and execution upon the Contractor. This two-phase approach-design followed by execution-is a standard framework for complex infrastructure projects. A market dialogue has been carried out before issuing the tender. The purpose of the market dialogue was to ensure that the project is attractive to the market, and to ensure competitive and compliant final tenders to be used as basis for the award of contract. Metroselskabet I/S is grateful for the potential tenderers who took their time to participate in the dialogue and provided input. INDICATIVE TIMESCHEDULE FOR THE PROCUREMENT Publication of contract notice September 10th 2026. Publication of tender documentation September 11th 2026. Deadline for submission of application for prequalification October 13th 2026, ref. made to section 5.1.12. Dialogue phase November 2026-October 2027. Final tender November 2027. Award of contract December 2027. The time-schedule may be subject to change.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 4 jours

Plus de cet acheteur

Profil complet de l'acheteur

18 marchés ouverts actuellement

Qui remporte habituellement les marchés de cet acheteur dans ce secteur

Entreprise Attributions Montant total attribué Dernière attribution
MT Højgaard Danmark A/S 1 €120,4M févr. 2026
Hitachi Rail STS SpA 1 €28,1M janv. 2026

Sur la base de 2 attributions avec un profil d'entreprise associé au cours des 5 dernières années.

Marchés similaires

Contexte de marché

Appel ouvert moyen · Travaux de construction
32 745 079 €
30 734 ouverts en Europe actuellement
Historique de l'acheteur sur Aperlena
23 avis suivis · 4 attribués
149 557 214 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

14 nouveaux avis pour Travaux de construction en Danemark au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer