The Aperlena Verdict
Open raceNo supplier dominates: 3 different companies have won the last 3 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- -26.7%
- Expected final price vs the published estimate
Based on 3 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contract covers the construction of a new gas holder and its machine room at the wastewater treatment plant site in Ceske Budejovice, including all related works. The scope includes relocation works, new sections of connecting pipework, cable routes, paved and unpaved areas and minor construction adjustments connected with the technology installation. The most significant parts are the replacement of biogas interconnecting pipework (SO 11), relocation of residual gas burners (SO 8.2), replacement or relocation of the site sewerage and water mains, repairs to affected surfaces (SO 12, SO 14), relocation and extension of outdoor lighting (SO 15), and minor works where biogas is captured or consumed. All construction takes place inside the existing fenced plant site.
Description
Official source
Source: VVZ - Věstník veřejných zakázek (MMR ČR)
Always verify details on the official notice.
Last verified against VVZ - Věstník veřejných zakázek (MMR ČR) 2 hours ago
More from this buyer
Full buyer profile6 open tenders right now
- Czech Republic - Technical engineering services - Road diagnostic surveys, exploration works, laboratory testing and PAU assessment under Decree No. 283/2023 Coll. on selected roads 1 day left
- Czech Republic - Road control, safety or signalling equipment - Red-light running monitoring CB.23 Dlouha louka x Husova, Ceske Budejovice 11 days left
- Centre for Contemporary Art and Architecture (House of Art) - building reconstruction - Stage I 22 days left
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| EUROVIA CZ a.s. | 1 | €3.5M | Feb 2026 |
| SWIETELSKY stavební s.r.o. | 1 | €1.1M | Apr 2026 |
| Šetři světlem s.r.o. | 1 | €184,284 | Jul 2026 |
Based on 3 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 6 comparable contracts this buyer awarded in this sector over the last 4 years.
- €1.7M
- Lower quartile
- €15.2M
- Median award
- €27.1M
- Upper quartile
This tender is estimated 78.3% below that median
Most recent awards
- Rekonstrukce elektroinstalace 1. NP I. učebního pavilonu Základní školy, Nerudova 9, České Budějovice €184,284
- Česko - Stavební práce pro vodovodní a kanalizační potrubí - České Budějovice - Haklovy Dvory - kanalizace, 2. etapa €1,136,157
- Česko - Stavební práce pro vodovodní a kanalizační potrubí - Rudolfovská ulice (Na Sadech - Nádražní) - 2. etapa €3,455,413
- Česko - Stavební práce - Rekonstrukce KD Slavie v Českých Budějovicích €27,297,266
- Česko - Stavební práce - Rekonstrukce KD Slavie v Českých Budějovicích €27,074,889
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Similar tenders
1
day left
€3,779,172
est. value
1
day left
€6,872,852
est. value
1
day left
€2,073,312
est. value
Market context
- Avg. open tender · Construction work
- €31,595,601
- Buyer track record on Aperlena
- 72 notices tracked · 37 awarded
- €99,497,608 in awarded contracts
Never miss a tender like this
340 new notices in Construction work in Czechia in the last 7 days. Get an email when new ones appear. Free.
Set up my alert