Skip to content
Aperlena

Find a Tender Service (UK Cabinet Office / Crown Commercial Service) verified 1 month ago Contract notice

Class 331 Heavy Maintenance infrastructure upgrade Allerton TCC

Closed United Kingdom Printed matter

Buyer Northern trains limited

€2.5M estimated value · €2,485,152 · converted from GBP

Key facts

Closed
16:00 (UTC+1)
Procedure
Open procedure Anyone may submit a bid, in one step, with no pre-selection. Full entry
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

This tender covers the upgrade of infrastructure at the Allerton TCC depot to support the heavy maintenance of the Class 331 rail fleet. The scope includes design, construction, EIS, handover and training, all completed before 1 March 2028. Key works include a synchronized vehicle jacking system for up to three Class 331 vehicles, floor strengthening and levelling, interlocking of jacks with the depot protection system, and painting of road 4 pits.

Timing

32 days from publication to deadline.

  1. Published
  2. Deadline
  3. Awarded pending

Description

Scope of Works: The supplier shall provide facilities capable of supporting the Heavy Maintenance re-quirements of the Class 331 fleet. The Class 331 Heavy Maintenance programme needs to start no later than 1st March 2028 to ensure that the Heavy Maintenance activities can be undertaken within the required maintenance schedule of the fleet and ensure it does not have a detrimental impact on customer rail services. - All design, construction, EIS, handover and training is required to have been completed in advance of the 1st March 2028. A high level programme is to be generated by the contractor as part of the tender process A key part of this programme is the replacement of bogies across the fleet, which needs to happen in an efficient way to maintain programme. 4-road at Allerton has been iden-tified as the location where this work will take place. To undertake bogie change re-placement on 4-road, the following items will need to be installed/addressed: · Installation of a vehicle jacking system capable of lifting 3 x class 331 vehicles in a synchronized manner without the need for splitting/decoupling the units. The system shall also be capable of jacking single and two car units. · To facilitate the vehicle jacking system, there will be a need for the supplier to ensure that the floor is capable to safely withstand the expected loads when jacking a Class 331, and that the floor is suitably level and flat for the jacks. Sur-veys will be required in order to validate this. · The supplier shall ensure that the jacks are interlocked with the Depot Protec-tion system so that no rail vehicle movements can take place unless jacks are in the stowed/birthed position. · The design shall ensure that there is adequate clearance for personnel to safely walk around the jacks in both operational and stowed positions. The preference is for the jacks to be mounted on rails and be compact to maximise clearance around the jacks. · Road 4 pits and floorings shall painted. · Circa 30m x 1.5m along road 4 has a side pitted area. As part of this work there would be a need to bring the height of these side pits to be level with the adja-cent flooring in order to accommodate the jacks and facilitate easy removal of jacks if required. This area should be reinforced throughout to enable jacking of any class of vehicle. As per design development a barrier should be considered between road 4 and 5 along this section to prevent the risk of falling from height from road 4 into the side pit of road 5, this cannot be of detriment to operations on adjacent road. · There is currently roof access equipment and a crane situated along road 4. NTL would like to retain this equipment. The expected positions of the jacks on road 4 have been marked out and it is not expected that the jacks would foul with these items of equipment. However, there will be a need for the supplier to vali-date that during lifting operations that the train is adequately clear of the roof ac-cess equipment. The supplier should make provision for modifications to the roof access equipment to ensure adequate clearance is achieved. · Once vehicles are lifted, the bogies would be rolled by hand along the rail to ei-ther end of the shed where a forklift will be used to lift the bogies and transfer to a storage location. There will be a need for the supplier to design and build a level concrete hardstanding to be extended on both ends of the shed in order to support the safe lifting of bogies by a forklift and the transfer of components from the hardstanding on road 4 to an identified storage location. · Storage for a minimum of 12 bogies in total, to be segregated into “clean” and “dirty” bogie storage. The ability to store 16 bogies in total should be explored within the designated area, to provide potential future capability. The identified location for storing the bogies is shown in the image below. · A battery forklift truck is proposed to be used. The supplier is required to work with NTL to identify a suitable fork lift truck. The supplier shall design and build a covered storage area for the Fork Lift Truck, with battery charging facilities. · A swept path analysis shall be undertaken for Fork Lift truck operations from the pick up position at the rail, to the storage location of bogies. The supplier shall check that there is adequate clearance and that floor loadings are acceptable throughout, inclusive of any RRAPs, manhole covers, general road surfacing. · The supplier shall undertake a Hazid review of the Fork Lift truck movement around site with the movement of components to ensure that any hazards are identified and mitigated where required. The solution delivered shall: · Support the HM331 maintenance strategy. · Support bogie change activities. · Support vehicle lifting and jacking operations. · Support heavy component replacement activities. · Maintain depot operational functionality during construction wherever reasona-bly practicable. · Comply with all relevant statutory and railway standards. · Provide a safe working environment. · Minimise future maintenance liabilities. · Facilitate efficient maintenance operations. · Be demonstrably operable, maintainable and safe. · Allow future flexibility where reasonably practicable. Where used throughout this notice, the meaning of Train Operating Companies includes all and any of those train operating companies who, currently or in the future, provide services for the carriage of passengers by railway: under a franchise agreement with the Secretary of State within the meaning of section 23(3) of the Railways Act 1993 or under, or secured under, the Secretary of State's duty in section 30(1) of the Railways Act 1993; or in accordance with legislation which supersedes or amends the powers referred to in a) and b), including where such powers are transferred from the Secretary of State to another body. The list of current providers of services for the carriage of passengers by railway under these provisions can be found at https://www.gov.uk/guidance/public-register-of-rail-passenger-contracts. Novation or Assignment The contract may be novated or assigned by Northern Trains Ltd to Train Operating Companies, or to DFT Operator Limited (company number: 07141122) or any successor parent company to a Train Operating Company, following a corporate restructuring or similar circumstance. Other Information Northern Trains Limited expressly reserves the right: not to award any suppliers the contract referred to in this notice; and in no circumstances will the customer be liable for any costs incurred by the suppliers. For more information about this opportunity, please visit the Delta E-Sourcing Portal at: https://www.delta-esourcing.com/73F9G864AP To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/73F9G864AP For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-York:-Designs./73F9G864AP To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/73F9G864AP

Official source

Source: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Always verify details on the official notice.

Last verified against Find a Tender Service (UK Cabinet Office / Crown Commercial Service) 1 month ago

Documents on Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (English)

Market

Printed matter in United Kingdom

median open notice
€93,150
More figures

Market context

open now in Printed matter
697
median open notice
€93,150

Who wins in this market

Many suppliers

United Kingdom · Printed matter

different companies won awards here
37
of the awards went to the three most frequent winners
24%
buyers awarded contracts here
36

Based on 51 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

The buyer in figures

Northern trains limited

Northern trains limited

United Kingdom

Similar tenders

Open now

16

days left

Heaton TRU Upgrades Designs

Northern Trains Ltd

16 days, United Kingdom Printed matter

€192,950 est. value

2

days left

Electoral Print Services

Thurrock Council

2 days, United Kingdom Printed matter

€466,646 est. value

Awarded before

Never miss a tender like this

12 new notices in Printed matter in United Kingdom in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Designs: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language