The Aperlena Verdict
Open raceNo supplier dominates: 17 different companies have won the last 56 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 56 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contract covers the delivery of the transport construction work 'Construction of Libuš station including completion of the tunnel (ND) - LI - construction part', meaning the construction of the Libuš station in Prague and the completion of the tunnel from the Nové Dvory station, whose own construction and the majority of the tunnel excavations are not part of this public contract, through to the Libuš station. The detailed scope is defined in the binding model contract and its annexes, in the project documentation and in the design standards for structures and lifts. The expected range of works is set out in the bill of quantities attached to the tender documents.
Description
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Czech.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 hours ago
Expected award price
- likely award for this notice, from its published estimate of €153,453,208
- €107.4M to €150.4M
Comparable awards in this country and sector came in at a median of 85% of their published estimate, half of them between 70% and 98%, based on 986 awards of the last 3 years.
Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.
What this buyer has paid before
Based on 73 comparable contracts this buyer awarded in this sector over the last 4 years.
- This notice
- €153.5M
- Median award
- €296,241
- Middle half of past awards
- €71,924 to €34.8M
The estimate is larger than three in four past awards.
Most recent awards
- Česko - Stavební práce - Oprava mostu Hůrka - Lužiny €5,280,390
- Construction of tramway lines - Tram line Malovanka - Strahov - selection of construction contractor €34,146,628
- Česko - Výstavba tramvajových drah - Tramvajová trať Olšanská - Habrová - výběr zhotovitele €24,761,725
- Česko - Výstavba tramvajových drah - Tramvajová trať Libuš - Nové Dvory, výběr zhotovitele stavby €51,553,136
- Česko - Výstavba podzemních drah - Výměna pohyblivých schodů a modernizace st. metra Hradčanská a distribuční transformovny Hradčanská €46,876,554
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileDopravní podnik hl. m. Prahy, akciová společnost
- notices in the register
- 1,050
- awards
- 758
- awarded in total
- €8.9B
Who wins its contracts
Many suppliers- different companies won its awards
- 217
- of the awards went to the three most frequent winners
- 10%
- of its calls state an estimated value
- 86%
Based on 679 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 2.4
- of those lots received a single tender
- 43%
- of the awards went to companies based in another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| EUROVIA CZ a.s. | 14 | €3.8M | Nov 2022 |
| Energovod CZ, a.s. | 9 | €752,281 | Nov 2023 |
| PROZNAK Praha, s.r.o. | 6 | €526,013 | Dec 2021 |
| Jeřáby Doškář s.r.o. | 6 | €37,008 | Apr 2024 |
| Pražské silniční stavby s.r.o. | 5 | €6.6M | Dec 2022 |
Based on 56 awards with a linked company profile over the last 5 years.
35 open tenders right now
- Czech Republic - Repairs and maintenance - Repair of switchboards, control cabinets and temporary provision of their operation during emergency conditions in metro stations, technical centres and lines 1 day left
- Czech Republic - Repair and maintenance of railway vehicles - Overhaul of gear couplings for 15T trams 6 days left
- Czech Republic - Repair and maintenance of electrical switchgear - Repair, inspection and testing of VD4 22 kV circuit breakers 6 days left
Market context
Larger than 97% of the open notices in Construction work across Europe.
- open now in Construction work
- 29,315
- median open notice
- €810,556
Who wins in this market
Many suppliersCzechia · Construction work
- different companies won awards here
- 1,220
- of the awards went to the three most frequent winners
- 7%
- buyers awarded contracts here
- 484
Based on 3,261 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.8
- of those lots received a single tender
- 23%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
6
days left
€11,917,034
est. value
8
days left
€11,824,877
est. value
12
days left
€11,810,380