The Aperlena Verdict
Open raceNo supplier dominates: 5 different companies have won the last 8 comparable contracts from this buyer over 5 years. This is a genuinely open race.
Based on 8 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contract covers renovation works on the Petrohan road maintenance depot building. Exterior works include chipping off damaged plaster down to sound substrate, restoring the plaster, dismantling and reinstalling roof covers, painting the facade, reversing windows, manufacturing and installing a cover over a water shaft, impregnating timber cladding, replacing damaged waterproofing on the roof of an auxiliary building, and varnishing its wooden elements. Interior works include demolition of ceramic and faience tiles, chipping the plaster, removing and refitting washbasins, replacing part of the clean and waste water pipework, restoring plaster with waterproofing, and laying tiles on walls and other surfaces.
Description
Terms of the procedure
- How tenders are scored
- Най-ниска цена
- Tenders go to
- app.eop.bg/today/606685
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Bulgarian.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
Expected award price
- likely award for this notice, from its published estimate of €15,000
- €14,550 to €15,000
Comparable awards in this country and sector came in at a median of 99% of their published estimate, half of them between 97% and 100%, based on 533 awards of the last 3 years.
Each award is compared with the estimate of the same lots, framework agreements excluded. A published estimate may include options and renewals, so an award under it is not always a discount.
What this buyer has paid before
Based on 5 comparable contracts this buyer awarded in this sector over the last 4 years.
- This notice
- €15,000
- Median award
- €428,105
- Middle half of past awards
- €196,362 to €474,676
The estimate is smaller than three in four past awards.
Most recent awards
- България - Строителни и монтажни работи по общо изграждане на подстанции - Подмяна на фундаменти за съоръжения в ОРУ 110 kV на п/с Букьовци €486,893
- България - Строителни и монтажни работи по общо изграждане на подстанции - Подмяна на фундаменти за съоръжения в ОРУ 110 kV на п/с Бонония €428,105
- България - Работи по нанасяне на антикорозионни покрития - Възстановяване на антикорозионно покритие на стомано-решетъчни стълбове на ВЛ 400 kV „Чирен - Вършец“ в участък от ст. №180 до ст. №253 €474,676
- България - Строителни и монтажни работи - Подмяна на мълниезащитно въже на ВЛ 400 кV „Петрохан“ в участък от ст. №218 до ст. №273 €196,362
- България - Работи по нанасяне на антикорозионни покрития - Възстановяване на антикорозионно покритие на стомано-решетъчни стълбове на ВЛ 400 kV „Петрохан“ в участък от ст. №41 до ст. № 81 €152,002
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileМРЕЖОВИ ЕКСПЛОАТАЦИОНЕН РАЙОН - МОНТАНА
- notices in the register
- 41
- awards
- 20
- awarded in total
- €2.2M
Who wins its contracts
Moderately concentrated- different companies won its awards
- 11
- of the awards went to the three most frequent winners
- 47%
- of its calls state an estimated value
- 100%
Based on 19 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.4
- of those lots received a single tender
- 14%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| ПОДСТАНЦИИ-2020 | 3 | €428,105 | Apr 2026 |
| СТРОЙКОНСУЛТ ЕООД | 2 | €626,678 | Sep 2025 |
| ЕМУ АД; ЕЛ КОНТРОЛ ЕООД; Т И Д ИНЖЕНЕРИНГ ЕООД | 1 | €486,893 | Dec 2025 |
| ИМПУЛС КО ООД | 1 | €196,362 | Aug 2025 |
| ИВ БИЛД БГ ЕООД | 1 | Aug 2026 |
Based on 8 awards with a linked company profile over the last 5 years.
3 open tenders right now
- Construction and installation works - Facade repair of the administrative building of the Montana Regional Educational Administration and replacement of asphalt pavement 15 days left
- Construction and installation works - Renovation of premises in the command and administrative building at Kozloduy NPP 24 days left
Market context
Larger than 2% of the open notices in Construction work across Europe.
- open now in Construction work
- 19,943
- median open notice
- €533,524
Who wins in this market
Many suppliersBulgaria · Construction work
- different companies won awards here
- 1,037
- of the awards went to the three most frequent winners
- 4%
- buyers awarded contracts here
- 407
Based on 2,424 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 2.7
- of those lots received a single tender
- 33%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
1
day left
€42,608
est. value
3
days left
€20,201
est. value
Awarded before
Never miss a tender like this
176 new notices in Construction work in Bulgaria in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.