Summary
Machine-generated summaryThe Road Infrastructure Agency of Bulgaria awarded a contract for the design and construction of a section of the Ruse - Veliko Tarnovo motorway. The works cover the Byala - Veliko Tarnovo section, divided into three separate positions: Sub-section 1 from km 76+040 to the crossing with Hemus motorway, Sub-section 2 from that crossing to the crossing with road I-4, and Sub-section 3 from road I-4 to road II-55. The contractor must prepare a complete technical design with a detailed bill of quantities, drawings and details, carry out the PUP-PP spatial planning procedure, and build and commission each sub-section. The estimated value is EUR 1,517,003,011.51. The contract has been awarded.
Description
3 lots
- Lot 1
- Обособена позиция № 1: Подучастък № 1: от км 76+040 до пресичането с АМ „Хемус“ estimated €508,735,422
- Lot 2
- Обособена позиция № 2: Подучастък № 2 от пресичане с АМ „Хемус“ чрез пътен възел до пресичане с път I-4 чрез пътен възел estimated €486,238,579
- Lot 3
- Обособена позиция № 3: Подучастък № 3 от пресичането с път I-4 до пресичането с път II-55 чрез пътен възел“ estimated €522,029,011
- How tenders are scored
- А - Оценка по технически показатели за проектиране и строителство: 40 points; Б - Оценка по финансови показатели за проектиране и строителство: 60 points
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 4 days ago
What this buyer has paid before
Based on 6 comparable contracts this buyer awarded in this sector over the last 4 years.
- This notice
- €1.5B
- Median award
- €3.6M
- Middle half of past awards
- €2.3M to €8.5M
The estimate is larger than three in four past awards.
Most recent awards
- България - Строителни и монтажни работи на пътища - „Проектиране и строителство на Автомагистрала „Струма“ Лот 3.1.- участък от км 373+300 до км 376+000, с решение, което трябва да изведе транзитния трафик от и за гр. Разлог и гр. Банско от границите на гр. Симитли...прод. в "Описание" €89,907,783
- България - Строителни и монтажни работи на пътища - „Избор на изпълнител за извършване на строително - монтажни работи на обект „Основен ремонт за подобряване организацията на движение на улица „33-ти Свищовски полк“, гр. Свищов /Републикански път II-52/“ €2,410,264
- България - Строителни и монтажни работи на пътища - „Избор на изпълнител на проектиране и строителство (инженеринг) на обекти от републиканската пътна мрежа, засегнати от неблагоприятни геодинамични процеси и явления, с които ще се кандидатства за финансиране по Програма „Околна среда“ 2021 - 2027 г., по четири обособени позиции" €1,105,139
- България - Строителни и монтажни работи на пътища - „Избор на изпълнител на проектиране и строителство (инженеринг) на обекти от републиканската пътна мрежа, засегнати от неблагоприятни геодинамични процеси и явления, с които ще се кандидатства за финансиране по Програма „Околна среда“ 2021 - 2027 г., по четири обособени позиции" €2,205,713
- България - Строителни и монтажни работи на пътища - „Избор на изпълнител на проектиране и строителство (инженеринг) на обекти от републиканската пътна мрежа, засегнати от неблагоприятни геодинамични процеси и явления, с които ще се кандидатства за финансиране по Програма „Околна среда“ 2021 - 2027 г., по четири обособени позиции" €4,819,403
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileАгенция "Пътна инфраструктура"
- notices in the register
- 398
- awards
- 179
- awarded in total
- €6.1B
Who wins its contracts
Many suppliers- different companies won its awards
- 94
- of the awards went to the three most frequent winners
- 25%
- of its calls state an estimated value
- 100%
Based on 159 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.8
- of those lots received a single tender
- 22%
- of the awards went to companies based in another country
- 0%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Awards most often to
9 open tenders right now
- Fire safety services - Fire alarm, maintenance, servicing and repair of fire safety equipment, systems and installations at the Road Infrastructure Agency, including 5 tunnels 1 day left
- Road construction and assembly works: Design and construction for permanent reinforcement of road III-560 Gorna Oryahovitsa - Veliko Tarnovo 5 days left
- Valuation consultancy services: preparation of valuation reports by independent valuers determining fair monetary compensation for properties affected by land acquisition procedures for linear infrastructure projects of the Road Infrastructure Agency 12 days left
Market context
- open now in Construction work
- 19,897
- median open notice
- €549,397
Who wins in this market
Many suppliersBulgaria · Construction work
- different companies won awards here
- 1,049
- of the awards went to the three most frequent winners
- 4%
- buyers awarded contracts here
- 416
Based on 2,468 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 2.7
- of those lots received a single tender
- 33%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
225 new notices in Construction work in Bulgaria in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Motorway construction works: an email when new tenders arrive under it, no account needed.