Summary
Machine-generated summaryInfrabel seeks a contractor to mill the rail heads on its Belgian rail network using a milling train with a productivity of at least 500 metres per hour for a material removal depth of 1.8 mm, equipped with an eddy current measuring system. The contract lasts 4 years with four optional 1-year extensions. Candidates are invited through a call for candidature.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago
The buyer
Full buyer profileInfrabel nv
- notices in the register
- 310
- awards
- 198
- awarded in total
- €273.9M
Who wins its contracts
Many suppliers- different companies won its awards
- 142
- of the awards went to the three most frequent winners
- 7%
- of its calls state an estimated value
- 0%
Based on 174 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.7
- of those lots received a single tender
- 7%
- of the awards went to companies based in another country
- 13%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
20 open tenders right now
- Cable laying - 57/43/3/26/118 Projects North - Power Distribution & Substations. External works 3 days left
- Railway construction - Linear civil engineering works on the Gembloux-Rhisnes section 7 days left
- Track laying - 57/52/2/25/028 - Masterplan Hasselt 2027: Renewal of tracks, track equipment, overhead lines and signalling (L34/L21) 9 days left
Market context
- open now in Repair & maintenance services
- 4,668
- median open notice
- €254,604
Who wins in this market
Many suppliersBelgium · Repair & maintenance services
- different companies won awards here
- 238
- of the awards went to the three most frequent winners
- 8%
- buyers awarded contracts here
- 176
Based on 306 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 2.3
- of those lots received a single tender
- 32%
- of the awards went to companies based in another country
- 6%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
23 new notices in Repair & maintenance services in Belgium in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Railway-track maintenance services: an email when new tenders arrive under it, no account needed.