Barbican Renewal Programme - Metalwork including feature stairs
Buyer: The Mayor and Commonalty and Citizens of the City of London
Country: United Kingdom
Estimated value: €6,517,746
Procedure: Restricted procedure
Sector (CPV): Construction work (45262670)
Aperlena: https://aperlena.com/en/t/barbican-renewal-programme-metalwork-including-feature-stairs-a86c2e8815
Official notice: https://www.find-tender.service.gov.uk/Notice/097543-2026
We email you if the deadline moves or a correction is published. Free.
Log in
01
Description
Barbican Renewal Programme - Metalwork Including Feature Stairs
The package covers the design, supply and installation of architectural metalwork and feature stairs across six work areas: the Conservatory (CN), Stair 8 (S8), the Art Gallery Foyers (AF), the Foyers (FY), the Catering Block (CB) and Infrastructure (IN). The items are a mix of new, proprietary and refurbished heritage metalwork, and the Conservatory stairs, balustrades and walkways are the largest part of the package. The scope within each area is summarised below:
• Conservatory (CN) - feature stairs: Free-standing Helical and Spiral stairs, and the West, East and South ground-bearing stairs, with their balustrades and the helical stair void guarding and gate.
• Conservatory (CN) - balustrades, gates and handrails: new glazed and planter balustrades to the flytower walkways, viewing platform, landscape and entrance ramp; refurbishment of the Arid House balcony and Level 06 flytower walkway balustrades; guarding to automated doors; gates; and brass handrails to ramps and steps.
• Conservatory (CN)- walkways and ladders: repairs to the existing access stair, platform and walkway; the duct-protection walkway; the Tower Walkway floor grille; The Ledge access platform; and the Shaft 20 access ladder and extendable pole.
• Conservatory (CN) - linings, fixtures and louvres: lift architraves, stainless linings, fascias, floor hatches, Theatre Fans louvred doors and screens, the Sculpture Court louvre screen, fin-tube heater brackets fixed to concrete, brass armrests, propagation benches, climber mesh, planters and the Nursery plant shelter; metal planter and lattice soffit repair; and new standalone mechanical louvres and refurbished vent panels fitted into existing openings.
• Stair 8 (S8): refurbished balustrade with new glass; the Stair 8 façade handrail removed, refurbished and refitted with LED lighting; and a perforated deck.
• Art Gallery Foyers (AF): refurbished mechanical louvres; and, to the Level 03 balconies, a new glazed balustrade and gate and bespoke metal planters.
• Foyers (FY) : hoop barriers, brass skirting, a goods-lift door, a brass mesh screen, recreated, refurbished and new balustrades, brass handrails, an access slope, foot-pump covers, drink shelves, cycle stands, refurbished louvres, and brass and hose reel cover plates. The brass handrail at the glazing is refurbished by TP4750 and free-issued to TP3300 Glazing and Envelop contractor for refitting.
• Catering Block (CB): offsite repair and reinstatement of the Level 1 balustrade; a new Level 2 balustrade inside the glazing, demountable for glazing access; a brass hoop barrier; and a terrace planter.
• Infrastructure (IN): plant fencing and gates, a loading bay gate, plantroom guarding, a fire-rated plant enclosure, ductwork panelling, the Service Road grille, and shaft-top louvre and bird mesh.
Design Responsibility
The package’s bespoke architectural metalwork and feature stair systems are Contractor Design Portion. The design team specifications set performance requirements and design intent only; the Contractor develops that intent into a complete, buildable design, including structural calculations, fabrication and shop drawings, connection design back to the primary and secondary structure, the Building Regulations approvals that depend on them, and coordination at every interface with adjoining trades. Naming a specific product or finish does not relieve the Contractor of that responsibility.
This includes the full structural design of the Helical, Spiral, West, East and South feature stairs; structural adequacy and loading design for all balustrades, guarding, working platforms and walkways, including permanent fall-restraint systems and their certification; and a condition-survey-led repair method and specification for every refurbishment item.
Official source
Source: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)
The Mayor and Commonalty and Citizens of the City of London
United Kingdom
notices in the register
118
awards
89
awarded in total
€4.4M
Who wins its contracts
Many suppliers
different companies won its awards
84
of the awards went to the three most frequent winners
7%
of its calls state an estimated value
93%
Based on 89 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable.
Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
20251
202615
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
This buyer has no award history in this sector yet. Usual winners, Construction work - United Kingdom
of the awards went to the three most frequent winners
6%
buyers awarded contracts here
388
Based on 1,481 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable.
Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.