Zum Inhalt springen
Aperlena

Manchester International Airport - Permanent Way Works

Geschlossen Auftragsbekanntmachung
Ausschreibung beobachten

Die Angebotsfrist ist vorbei. Ein Zuschlag oder eine Berichtigung zu dieser Bekanntmachung: eine E-Mail, wenn das Register es sieht. Anmelden

  1. Veröffentlicht
  2. Frist 9 Tage offen
  3. Vergeben ausstehend

Beschreibung

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.

Amtliche Quelle

Quelle: Contracts Finder (UK Cabinet Office)

Prüfen Sie alle Angaben stets in der amtlichen Bekanntmachung.

Zuletzt mit Contracts Finder (UK Cabinet Office) abgeglichen vor 1 Monat

Unterlagen auf Contracts Finder (UK Cabinet Office) (Englisch)

Ähnliche Ausschreibungen

Marktkontext

Ø offene Ausschreibung · Bauarbeiten
33.227.159 €
31.306 aktuell offen in Europa 91% unter dem Branchenschnitt
Vergabehistorie auf Aperlena
2 erfasste Bekanntmachungen · 0 vergeben

Verpassen Sie keine Ausschreibung wie diese

885 neue Bekanntmachungen für Bauarbeiten in Vereinigtes Königreich in den letzten 7 Tagen. Erhalten Sie eine E-Mail, wenn neue erscheinen. Kostenlos.

Benachrichtigung einrichten

Tastaturkürzel

Eine Liste lesen, ohne zur Maus zu greifen. In einem Eingabefeld bleiben die Kürzel stumm.

j
Nächstes Ergebnis
k
Vorheriges Ergebnis
Enter
Ergebnis öffnen
n
Nächste Seite
p
Vorherige Seite
c
Dieses Ergebnis vergleichen
s
Dieses Ergebnis auf die Merkliste setzen
/
Zum Suchfeld springen
?
Diese Kürzel anzeigen
Esc
Schließen