Przejdź do treści
Aperlena

Manchester International Airport - Permanent Way Works

Zamknięty Ogłoszenie o zamówieniu
Obserwuj ten przetarg

Składanie ofert zakończone. Udzielenie zamówienia lub sprostowanie tego ogłoszenia: e-mail, gdy rejestr to zobaczy. Zaloguj się

  1. Opublikowano
  2. Termin składania otwarte 9 dni
  3. Udzielony oczekuje

Opis

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.

Oficjalne źródło

Źródło: Contracts Finder (UK Cabinet Office)

Zawsze weryfikuj szczegóły w oficjalnym ogłoszeniu.

Ostatnia weryfikacja w Contracts Finder (UK Cabinet Office) 1 miesiąc temu

Dokumenty w Contracts Finder (UK Cabinet Office) (angielski)

Podobne przetargi

Kontekst rynkowy

Śr. otwarty przetarg · Roboty budowlane
33 227 159 €
31 306 otwartych teraz w Europie 91% poniżej średniej sektora
Historia zamawiającego w Aperlena
2 zarejestrowanych ogłoszeń · 0 udzielonych

Nie przegap przetargów takich jak ten

884 nowych ogłoszeń w ostatnich 7 dniach: Roboty budowlane, Wielka Brytania. Otrzymuj e-mail, gdy pojawią się nowe ogłoszenia. Za darmo.

Ustaw mój alert

Skróty klawiszowe

Przeglądaj listę bez sięgania po mysz. Skróty nie działają podczas pisania w polu.

j
Następny wynik
k
Poprzedni wynik
Enter
Otwórz wynik
n
Następna strona
p
Poprzednia strona
c
Porównaj ten wynik
s
Dodaj ten wynik do krótkiej listy
/
Przejdź do pola wyszukiwania
?
Pokaż te skróty
Esc
Zamknij