Vai al contenuto
Aperlena

Manchester International Airport - Permanent Way Works

Chiusa Bando di gara
Segui questa gara

Le offerte sono chiuse. Un'aggiudicazione o una rettifica su questo avviso: un'email quando il registro lo vede. Accedi

  1. Pubblicata
  2. Scadenza aperta 9 giorni
  3. Aggiudicata in attesa

Descrizione

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.

Fonte ufficiale

Fonte: Contracts Finder (UK Cabinet Office)

Verifica sempre i dettagli nell'avviso ufficiale.

Ultima verifica su Contracts Finder (UK Cabinet Office) 1 mese fa

Documenti su Contracts Finder (UK Cabinet Office) (inglese)

Gare simili

Contesto di mercato

Gara aperta media · Lavori di costruzione
33.227.159 €
31.306 aperte ora in Europa 91% sotto la media del settore
Storico della stazione appaltante su Aperlena
2 avvisi tracciati · 0 aggiudicati

Non perderti nessuna gara come questa

885 nuovi avvisi per Lavori di costruzione in Regno Unito negli ultimi 7 giorni. Ricevi un'email quando escono nuovi avvisi. Gratis.

Crea il mio avviso

Scorciatoie da tastiera

Scorri un elenco senza toccare il mouse. Le scorciatoie restano inattive mentre scrivi in un campo.

j
Risultato successivo
k
Risultato precedente
Invio
Apri il risultato
n
Pagina successiva
p
Pagina precedente
c
Confronta questo risultato
s
Aggiungi questo risultato alla shortlist
/
Vai al campo di ricerca
?
Mostra queste scorciatoie
Esc
Chiudi