Manchester International Airport - Permanent Way Works

Clôturé Avis de marché
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Publié
  2. Date limite ouvert 9 jours
  3. Attribué en attente

Description

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.

Source officielle

Source : Contracts Finder (UK Cabinet Office)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Contracts Finder (UK Cabinet Office) il y a 1 mois

Documents sur Contracts Finder (UK Cabinet Office) (anglais)

Marchés similaires

Contexte de marché

Appel ouvert moyen · Travaux de construction
33 194 447 €
30 835 ouverts en Europe actuellement 91% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
2 avis suivis · 0 attribués

Ne manquez plus aucun marché comme celui-ci

889 nouveaux avis pour Travaux de construction en Royaume-Uni au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer