Zum Inhalt springen
Aperlena

World Bank - Procurement Notices (Bank-financed projects) geprüft vor 12 Stunden Auftragsbekanntmachung

Environmental and Social Specialist - full-time (local)

Offen Nordmazedonien

Auftraggeber PE Hydrosystem Zletovica

15 Tage übrig

Eckdaten

Frist endet
12:00 (UTC+1)
  1. Veröffentlicht
  2. Heute
  3. Frist 18 Tage offen
  4. Vergeben ausstehend
Zur amtlichen Bekanntmachung Ausschreibung beobachten

Verschiebt sich die Frist oder wird die Bekanntmachung berichtigt, schreiben wir Ihnen. Anmelden

Beschreibung

Verfahren
Individual Consultant Selection
Finanzierung
World Bank
Aktenzeichen
PIREP-IC-05
Project: P515976 - Zletovica Productivity through Irrigation and Renewable Energy Reference: PIREP-IC-05 Procurement method: Individual Consultant Selection Financing: World Bank REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - INDIVIDUAL CONSULTANT - LOCAL) Republic of North Macedonia Ministry of Agriculture, Forestry and Water Economy Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP) Grant No.: TF0D2152 Assignment Title: Environmental and Social Specialist - Project Implementation Unit Reference No.: PIREP-IC-08 The Republic of North Macedonia has received financing from the World Bank, acting as trustee of the Grant Facility for Project Preparation (GFPP), for the preparation of the Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP), and intends to apply part of the proceeds for consulting services. The Ministry of Agriculture, Forestry and Water Economy (MAFWE), through its Project Implementation Unit (PIU), is responsible for implementation of the grant. The preparation grant supports the updating of technical and hydraulic studies, dam safety documentation, transboundary-water analyses, and environmental and social instruments for Phases II and III of the Zletovica Hydrosystem, comprising irrigation development and hydropower generation. The PIU implements the grant in close coordination with the Public Enterprise for Water Management Activities HS “Zletovica”-Probištip (PE HS Zletovica), which provides technical leadership, data, access to facilities and institutional support. The objective of the assignment is to ensure that environmental and social considerations are systematically integrated into: (i) the planning and implementation of GFPP-financed studies, surveys, investigations, and other preparatory activities; and (ii) the technical, environmental, social, permitting, procurement, and institutional preparation of the proposed World Bank-financed investment for Phases II and III. The Specialist will support compliance with the World Bank Environmental and Social Framework (ESF), the Environmental and Social Standards (ESSs) determined to be relevant through project screening and assessment, the World Bank Group Environmental, Health and Safety Guidelines, applicable good international industry practice, World Bank Operational Policy OP 7.50 on Projects on International Waterways, as applicable, and the environmental and social legislation of North Macedonia. The assignment will cover integrated environmental and social risk management, while recognizing that specialized technical inputs may be required for complex subjects. Particular emphasis will be placed on environmental and social assessment, biodiversity and natural-habitat protection, environmental flows and water quality, pollution prevention, land and livelihood impacts, labor and working conditions, stakeholder engagement and grievance management, dam and community safety, climate resilience, cumulative and transboundary impacts, cultural heritage, and incorporation of mitigation measures into designs, cost estimates, bidding documents, contracts, and supervision arrangements. The Environmental and Social Specialist will serve as the Project Implementation Unit’s principal environmental and social focal point and will support the unit in managing environmental and social risks associated with GFPP-financed preparatory activities and the proposed Zletovica irrigation and hydropower investments, ensuring compliance with national legislation, the World Bank Environmental and Social Framework, relevant Environmental and Social Standards, and applicable requirements on international waterways. Responsibilities will include screening project activities; reviewing and quality-assuring environmental and social assessments and management instruments; integrating mitigation measures into technical designs, bidding documents and implementation arrangements; and addressing water resources, biodiversity, climate, cumulative impacts, land acquisition, labor and community safety considerations, in coordination with technical and dam-safety experts. The Specialist will monitor preparatory field activities and corrective actions, support incident reporting, coordinate stakeholder engagement and grievance management, track environmental and social commitments and permitting requirements, liaise with competent authorities and the World Bank, and provide training, technical advice and reporting to strengthen the PIU’s and PE HS Zletovica’s capacity for project preparation and implementation. The Specialist will report directly to the PIU Coordinator and will work in close coordination with PE HS Zletovica management and technical staff, World Bank environmental and social specialists, consultants preparing technical and environmental and social documentation, and relevant national and local authorities. PE HS Zletovica and other stakeholders will provide inputs through the PIU Coordinat

Bieten oder nicht bieten?

Sechs Fragen, bevor Sie ein Team binden. Unter jeder steht, was das Register dazu weiß. Die Antworten geben Sie.

  1. Ihre Einschätzung:

    Erfüllen wir jedes Eignungskriterium?

    Dazu enthält das Register nichts. Die offiziellen Unterlagen schon.

  2. Ihre Einschätzung:

    Können wir das mit dem vorhandenen Team leisten?

    Dazu enthält das Register nichts. Die offiziellen Unterlagen schon.

  3. Ihre Einschätzung:

    Haben wir zwei vergleichbare Referenzen?

    Dazu enthält das Register nichts. Die offiziellen Unterlagen schon.

  4. Spricht für Sie:

    Reicht die Frist für ein ordentliches Angebot?

    Noch 15 Tage, davon 12 Arbeitstage.

  5. Ihre Einschätzung:

    Bleibt beim voraussichtlichen Zuschlagspreis eine Marge?

    Dazu enthält das Register nichts. Die offiziellen Unterlagen schon.

  6. Ihre Einschätzung:

    Kennen wir diesen Auftraggeber?

    Der Auftraggeber hat 3 Bekanntmachungen im Register und noch kein Muster bei den Gewinnern.

Amtliche Quelle

Quelle: World Bank - Procurement Notices (Bank-financed projects)

Prüfen Sie alle Angaben stets in der amtlichen Bekanntmachung.

Einen Fehler in dieser Bekanntmachung melden

Zuletzt mit World Bank - Procurement Notices (Bank-financed projects) abgeglichen vor 12 Stunden

Unterlagen auf World Bank - Procurement Notices (Bank-financed projects) (Englisch)

PE Hydrosystem Zletovica

Nordmazedonien

Bekanntmachungen im Register
3

3 offene Ausschreibungen derzeit

Ähnliche Ausschreibungen

Jetzt offen

Verpassen Sie keine Ausschreibung wie diese

459 neue Bekanntmachungen für alle Sektoren in Nordmazedonien in den letzten 7 Tagen. Erhalten Sie eine E-Mail, wenn neue erscheinen. Kostenlos.

Benachrichtigung einrichten

15 Tage übrig

Original öffnen

Tastaturkürzel

Eine Liste lesen, ohne zur Maus zu greifen. In einem Eingabefeld bleiben die Kürzel stumm.

j
Nächstes Ergebnis
k
Vorheriges Ergebnis
Enter
Ergebnis öffnen
n
Nächste Seite
p
Vorherige Seite
c
Dieses Ergebnis vergleichen
s
Dieses Ergebnis auf die Merkliste setzen
o
Ergebnis in neuem Tab öffnen
x
Dieses Ergebnis beiseitelegen
/
Von jeder Seite aus suchen
Strg K
Von jeder Seite aus suchen
?
Diese Kürzel anzeigen
Esc
Schließen

Verzeichnis

Schließen
Anmelden

Sprache