Saltar al contenido
Aperlena

World Bank - Procurement Notices (Bank-financed projects) verificado hace 8 horas Anuncio de licitación

Environmental and Social Specialist - full-time (local)

Abierta Macedonia del Norte

Órgano de contratación PE Hydrosystem Zletovica

15 días restantes

Datos clave

Cierra
12:00 (UTC+1)
  1. Publicada
  2. Hoy
  3. Fecha límite abierta 18 días
  4. Adjudicada pendiente
Ver el anuncio oficial Vigilar esta licitación

Si cambia el plazo o se corrige el anuncio, te escribimos. Iniciar sesión

Descripción

Procedimiento
Individual Consultant Selection
Financiación
World Bank
Expediente
PIREP-IC-05
Project: P515976 - Zletovica Productivity through Irrigation and Renewable Energy Reference: PIREP-IC-05 Procurement method: Individual Consultant Selection Financing: World Bank REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - INDIVIDUAL CONSULTANT - LOCAL) Republic of North Macedonia Ministry of Agriculture, Forestry and Water Economy Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP) Grant No.: TF0D2152 Assignment Title: Environmental and Social Specialist - Project Implementation Unit Reference No.: PIREP-IC-08 The Republic of North Macedonia has received financing from the World Bank, acting as trustee of the Grant Facility for Project Preparation (GFPP), for the preparation of the Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP), and intends to apply part of the proceeds for consulting services. The Ministry of Agriculture, Forestry and Water Economy (MAFWE), through its Project Implementation Unit (PIU), is responsible for implementation of the grant. The preparation grant supports the updating of technical and hydraulic studies, dam safety documentation, transboundary-water analyses, and environmental and social instruments for Phases II and III of the Zletovica Hydrosystem, comprising irrigation development and hydropower generation. The PIU implements the grant in close coordination with the Public Enterprise for Water Management Activities HS “Zletovica”-Probištip (PE HS Zletovica), which provides technical leadership, data, access to facilities and institutional support. The objective of the assignment is to ensure that environmental and social considerations are systematically integrated into: (i) the planning and implementation of GFPP-financed studies, surveys, investigations, and other preparatory activities; and (ii) the technical, environmental, social, permitting, procurement, and institutional preparation of the proposed World Bank-financed investment for Phases II and III. The Specialist will support compliance with the World Bank Environmental and Social Framework (ESF), the Environmental and Social Standards (ESSs) determined to be relevant through project screening and assessment, the World Bank Group Environmental, Health and Safety Guidelines, applicable good international industry practice, World Bank Operational Policy OP 7.50 on Projects on International Waterways, as applicable, and the environmental and social legislation of North Macedonia. The assignment will cover integrated environmental and social risk management, while recognizing that specialized technical inputs may be required for complex subjects. Particular emphasis will be placed on environmental and social assessment, biodiversity and natural-habitat protection, environmental flows and water quality, pollution prevention, land and livelihood impacts, labor and working conditions, stakeholder engagement and grievance management, dam and community safety, climate resilience, cumulative and transboundary impacts, cultural heritage, and incorporation of mitigation measures into designs, cost estimates, bidding documents, contracts, and supervision arrangements. The Environmental and Social Specialist will serve as the Project Implementation Unit’s principal environmental and social focal point and will support the unit in managing environmental and social risks associated with GFPP-financed preparatory activities and the proposed Zletovica irrigation and hydropower investments, ensuring compliance with national legislation, the World Bank Environmental and Social Framework, relevant Environmental and Social Standards, and applicable requirements on international waterways. Responsibilities will include screening project activities; reviewing and quality-assuring environmental and social assessments and management instruments; integrating mitigation measures into technical designs, bidding documents and implementation arrangements; and addressing water resources, biodiversity, climate, cumulative impacts, land acquisition, labor and community safety considerations, in coordination with technical and dam-safety experts. The Specialist will monitor preparatory field activities and corrective actions, support incident reporting, coordinate stakeholder engagement and grievance management, track environmental and social commitments and permitting requirements, liaise with competent authorities and the World Bank, and provide training, technical advice and reporting to strengthen the PIU’s and PE HS Zletovica’s capacity for project preparation and implementation. The Specialist will report directly to the PIU Coordinator and will work in close coordination with PE HS Zletovica management and technical staff, World Bank environmental and social specialists, consultants preparing technical and environmental and social documentation, and relevant national and local authorities. PE HS Zletovica and other stakeholders will provide inputs through the PIU Coordinat

¿Licitamos o no?

Seis preguntas antes de comprometer a un equipo. Debajo de cada una, lo que el registro sabe de ella. Las respuestas son tuyas.

  1. Lo decides tú:

    ¿Cumplimos todos los requisitos de solvencia?

    El registro no tiene nada sobre esto. Los documentos oficiales sí.

  2. Lo decides tú:

    ¿Podemos ejecutarlo con el equipo que tenemos?

    El registro no tiene nada sobre esto. Los documentos oficiales sí.

  3. Lo decides tú:

    ¿Tenemos dos referencias comparables?

    El registro no tiene nada sobre esto. Los documentos oficiales sí.

  4. A tu favor:

    ¿Da tiempo a preparar una oferta seria?

    Quedan 15 días, 12 de ellos laborables.

  5. Lo decides tú:

    ¿Queda margen al precio probable de adjudicación?

    El registro no tiene nada sobre esto. Los documentos oficiales sí.

  6. Lo decides tú:

    ¿Conocemos a este órgano de contratación?

    El comprador tiene 3 anuncios en el registro y todavía ningún patrón de adjudicatarios.

Fuente oficial

Fuente: World Bank - Procurement Notices (Bank-financed projects)

Verifica siempre los detalles en el anuncio oficial.

Avisar de un error en este anuncio

Última verificación con World Bank - Procurement Notices (Bank-financed projects) hace 8 horas

Documentos en World Bank - Procurement Notices (Bank-financed projects) (inglés)

PE Hydrosystem Zletovica

Macedonia del Norte

anuncios en el registro
3

3 licitaciones abiertas ahora mismo

Licitaciones similares

Abiertas ahora

No te pierdas ninguna licitación como esta

459 anuncios nuevos de todos los sectores en Macedonia del Norte en los últimos 7 días. Recibe un email cuando aparezcan anuncios nuevos. Gratis.

Crear mi alerta

15 días restantes

Abrir anuncio

Atajos de teclado

Recorre una lista sin tocar el ratón. Los atajos no actúan mientras escribes en un campo.

j
Resultado siguiente
k
Resultado anterior
Intro
Abrir el resultado
n
Página siguiente
p
Página anterior
c
Comparar este resultado
s
Añadir este resultado a la lista corta
o
Abrir el resultado en una pestaña nueva
x
Apartar este resultado
/
Buscar desde cualquier página
Ctrl K
Buscar desde cualquier página
?
Mostrar estos atajos
Esc
Cerrar

Índice

Cerrar
Iniciar sesión

Idioma