Summary
Machine-generated summaryThis is a total-price integrated construction contract for shore pier works at Stallören covering 2026-2028. The works include demolition of existing shore piers, relocation of pontoon piers, dredging of shore areas and soil replacement, and construction of a new shore pier in the scope required by clause 3.4 of the draft contract, in accordance with all contract documents so that the final result, structures, technical systems and building materials meet the set requirements. As an option, the contract covers building section M (Makasiinit) of the shore pier, including its retaining walls, foundations and structures. Surface finishes shown in the informative landscape plan are not included. The client will supply a sufficient quantity of bottom ash from Raasepori Energi A's Tammisaari plant for stabilising dredged materials at the Baggönti stockpile area.
Description
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid.
- The notice is written in Finnish.
- Tender documents: tarjouspalvelu.fi
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: HILMA - hankintailmoitukset.fi (Hansel Oy)
Always verify details on the official notice.
Report an error in this notice
Last verified against HILMA - hankintailmoitukset.fi (Hansel Oy) 2 hours ago
The official portal may ask for a free registration before downloading.
What this market pays
The buyer has too few awards of its own in this sector, so this is the range of the last 489 awards for Construction work in Finland.
- Median award
- €4.2M
- Middle half of past awards
- €615,000 to €10.4M
HILMA - hankintailmoitukset.fi (Hansel Oy) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileRaaseporin kaupunki
- notices in the register
- 112
- awards
- 9
- awarded in total
- €26.5M
Who wins its contracts
- of its calls state an estimated value
- 14%
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
This buyer has no award history in this sector yet. Usual winners, Construction work - Finland
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| GRK Suomi Oy | 15 | €196.6M | Jun 2026 |
| Kreate Oy | 12 | €210.1M | Aug 2026 |
| VM Suomalainen Oy | 11 | €59.6M | Jun 2026 |
| Consti Korjausrakentaminen Oy | 9 | €546.3M | Jul 2026 |
| Caverion Suomi Oy | 9 | €61.6M | Jun 2026 |
Based on 516 awards with a linked company profile over the last 2 years.
2 open tenders right now
Market context
HILMA - hankintailmoitukset.fi (Hansel Oy) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 28,895
- median open notice
- €801,999
Who wins in this market
Many suppliersFinland · Construction work
- different companies won awards here
- 335
- of the awards went to the three most frequent winners
- 7%
- buyers awarded contracts here
- 199
Based on 516 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Similar tenders
Open now
2
days left
€1,000,000
est. value
4
days left
€240,000
est. value
Awarded before
Never miss a tender like this
8,676 new notices in Construction work in Finland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert