The Aperlena Verdict
Incumbent-lockedTRANSSERVIS, a.s. Košice has won 1 of the last 1 comparable contracts from this buyer over 5 years. Winning here means displacing an incumbent, so price the effort accordingly.
Based on 1 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe works cover the renewal of the railway superstructure on the double-track electrified line between ZST Muzla and ZST Gbelce, including replacement of rails, sleepers and fastenings, full-profile cleaning or removal of the track ballast bed and replenishment of ballast. Track 1 is 6,588 m and track 2 is 6,502 m long. The scope also includes replacing level crossing structures, repairing railway substructure works such as unlined drainage ditches, culvert cleaning and repair works on a bridge, replacing track equipment on tracks 1 and 2, and repairing or replacing signalling and telecom (OZT) equipment. At ZST Gbelce, track 1 (881 m) and track 2 (935 m) will be renewed, along with switches No. 1-6, 13, 14, 17-20 including inter-track sections, level crossing repair, platforms 1 and 2, and OZT equipment works. Removal of overhanging vegetation endangering railway safety is also included.
Description
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Slovak.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 5 days ago
More from this buyer
Full buyer profile11 open tenders right now
- Protective footwear - Work and safety footwear 1 day left
- Electricity - Joint supply of traction electricity including imbalance responsibility for third parties, 12 months, from 1 January 2027 to 31 December 2027 2 days left
- Construction works - Traction substation Valaliky 9 days left
This buyer has no award history in this sector yet. Usual winners, Construction work - Slovakia
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| COLAS Slovakia, a.s. | 21 | €5.8M | Sep 2026 |
| STRABAG s.r.o. | 20 | €17.6M | Sep 2026 |
| EUROVIA SK, a.s. | 19 | €27.9M | Sep 2026 |
| Metrostav DS a.s. | 13 | €16.3M | Sep 2026 |
| BAUMANN Nitra s.r.o. | 11 | €3.3M | Sep 2026 |
Based on 503 awards with a linked company profile over the last 2 years.
Similar tenders
1
day left
Construction works - Road border crossing Vysne Nemecke, passenger transport - expansion of the site
€7,381,153
est. value
1
day left
€98,134,850
est. value
1
day left
€87,567,844
est. value
Market context
- Avg. open tender · Construction work
- €32,819,728
- Buyer track record on Aperlena
- 108 notices tracked · 20 awarded
- €1,146,664,648 in awarded contracts
Never miss a tender like this
89 new notices in Construction work in Slovakia in the last 7 days. Get an email when new ones appear. Free.
Set up my alert