Summary
Machine-generated summaryThe existing heat generation plant at the Schürmatt site in Zetzwil is to be comprehensively renovated and replaced. The existing wood chip boiler and the existing oil boiler, including the oil tank installation and no longer required installations, will be dismantled and properly disposed of. As a replacement, two new wood chip boilers in cascade configuration will be installed in the existing boiler room. The new heat generators will be hydraulically integrated into the existing heating distributor. The existing heating distributor and the existing thermal storage tanks will be retained; the storage tanks will be hydraulically reconnected according to the new plant concept. The flue gas system will be adapted and connected to the existing chimney. All necessary hydraulic, electrical and control adaptations as well as adjustment of the building automation are included. The works take place mainly within the existing heating centre.
Description
Official source
Source: simap.ch - Swiss public procurement platform
Always verify details on the official notice.
Last verified against simap.ch - Swiss public procurement platform 5 days ago
More from this buyer
Full buyer profileThis buyer has no award history in this sector yet. Usual winners, Construction work - Switzerland
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| DE_Equans Switzerland AG | 14 | €19.2M | Sep 2026 |
| FR_Weibel AG | 12 | €12.1M | Jul 2026 |
| DE_Anliker AG Bauunternehmung | 11 | €76.6M | Jul 2026 |
| DE_Walo Bertschinger AG | 11 | €61.9M | Aug 2026 |
| DE_Frutiger AG | 10 | €485.9M | Aug 2026 |
Based on 1711 awards with a linked company profile over the last 2 years.
Similar tenders
Market context
- Avg. open tender · Construction work
- €33,227,159
- Buyer track record on Aperlena
- 1 notices tracked · 0 awarded
Never miss a tender like this
369 new notices in Construction work in Switzerland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert