Summary
Machine-generated summaryThe contracting authority is procuring a combined package of design services, technical verification, design support during the execution phase, and construction and assembly works for the project 'Energy Efficiency of the Floare de Colt Extended-Hours Kindergarten'. The contract is not divided into lots. The procedure includes periods for requesting clarifications before the offer submission deadline, with the authority answering all clarification requests within the deadlines set in the award documentation. The procurement is launched under a suspensive condition: the contract will be concluded with the winning bidder only if funding is secured through the PRSM 2021-2027 programme with the South-Muntenia Regional Development Agency, and the procedure may be cancelled if the financing contract is not signed.
Description
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Romanian.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 32 minutes ago
What this market pays
The buyer has too few awards of its own in this sector, so this is the range of the last 1,563 awards for Construction work in Romania.
- This notice
- €2.3M
- Median award
- €5.5M
- Middle half of past awards
- €1.9M to €11.3M
The estimate sits inside the usual range.
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileMUNICIPIUL PITESTI - CONSILIUL LOCAL AL MUNICIPIULUI PITESTI
- notices in the register
- 25
- awards
- 10
- awarded in total
- €20.1M
Who wins its contracts
Moderately concentrated- different companies won its awards
- 9
- of the awards went to the three most frequent winners
- 40%
- of its calls state an estimated value
- 100%
Based on 10 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| DOMARCONS; VALAH CONSTRUCT GRUP | 1 | €4.1M | Sep 2026 |
| CONSTRUCTII DRUMURI SI LUCRARI DE ARTA S.R.L.; TEHNO CONSULTING SOLUTION; EUROPAN PROD S.A.; PORR CONSTRUCT | 1 | €1.5M | Jul 2026 |
Based on 2 awards with a linked company profile over the last 5 years.
8 open tenders right now
- Construction works - Design services, technical verification, designer's technical assistance during execution and construction-assembly works for the project 'Energy efficiency of the Mircea Eliade Secondary School' 2 days left
- Construction works - Design, technical verification, designer's technical assistance during execution and construction and assembly works for the 'Energy Efficiency of Mircea Eliade Secondary School' project 2 days left
- Construction works - Design services, technical verification, designer's technical assistance during execution and construction-assembly works for the 'Energy Efficiency of Negru Voda Secondary School' project 22 days left
Market context
Larger than 61% of the open notices in Construction work across Europe.
- open now in Construction work
- 29,184
- median open notice
- €810,683
Who wins in this market
Many suppliersRomania · Construction work
- different companies won awards here
- 1,143
- of the awards went to the three most frequent winners
- 6%
- buyers awarded contracts here
- 400
Based on 1,646 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.