Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 day ago Contract award

Romania - Gas pipeline construction works - Replacement of SRM Măgurele Bucharest, PT TG_INV_10022 (1332/2019)

Original România - Lucrări de construcţii de gazoducte - Înlocuire SRM Măgurele București, PT TG_INV_10022 (1332/2019)

Awarded Romania Bucureşti-Ilfov Construction work

Buyer Societatea Nationala de Transport Gaze Naturale TRANSGAZ SA

€8.1M awarded value · €8,123,691

Key facts

Published
Procedure
Open procedure
  1. Published
  2. Awarded pending

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish the date of this award. See the official notice

View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

TOTALGAZ INDUSTRIE

Awarded value
€8,123,691
Bid received
1 A single tender
Record with this buyer
2 contracts from this buyer in the register, €9.0M in total

Summary

Machine-generated summary

TRANSGAZ SA, the Romanian national natural gas transmission company, awarded a sectoral contract for the replacement of the SRM Măgurele Bucharest gas station, identified as PT TG_INV_10022 (1332/2019). The works involve gas pipeline construction. The contract was won by TOTALGAZ INDUSTRIE, with an awarded value of about EUR 8,123,691.30, converted from RON at the ECB reference rate. The original notice expressed the estimated value in RON as 45,738,640.99 lei excluding VAT, with an upper range of 54,886,369.19 lei including a possible 20% quantity increase. The proposed execution period was 12 months and the contractor was to procure the materials itself.

Description

Entitatea contractantă intenționează să încheie un contract sectorial având ca obiect: Înlocuire SRM Măgurele București, PT TG_INV_10022 (1332/2019) Data limită până la care operatorii economici au dreptul de a solicita clarificări sau informații suplimentare în legătură cu documentația de atribuire, este a 18-a zi dinaintea datei limita de depunere a ofertelor, conform prevederilor art. 173 Legea nr. 99/2016, modificată și completată de OUG 107/2017 pentru modificarea și completarea unor acte normative cu impact în domeniul achizițiilor publice. Termenul-limită în care entitatea contractantă va răspunde în mod clar și complet tuturor solicitărilor de clarificare/informațiilor suplimentare conform prevederilor art. 172 alin. 2, coroborat cu art. 173 din Legea nr. 99/2016, modificată și completată de OUG 107/2017 pentru modificarea și completarea unor acte normative cu impact în domeniul achizițiilor publice, este: a 11-a zi dinaintea datei limita de depunere a ofertelor. Valoarea estimată totală a achiziției, fără valoarea aferentă cheltuielilor diverse și neprevăzute, este de 45.738.640,99 lei, fără TVA. Valoarea inferioară a intervalului detaliind valoarea estimată, și anume 45.738.640,99 lei, reprezintă valoarea estimată a achiziției pentru cantitățile ce se vor achiziționa în baza contractului sectorial, fără eventualele suplimentări. Valoarea superioară a intervalului detaliind valoarea estimată, și anume 54.886.369,19 lei, reprezintă valoarea estimată cuprinzând o eventuală suplimentare a contractului sectorial cu 20% a cantității de lucrări prin clauze de revizuire stabilite prin contract, în concordanță cu dispozițiile art. 236 din Legea nr. 99/2016. Materialele necesare pentru execuția lucrărilor nu se vor pune la dispoziție de către Entitatea Contractantă, acestea se vor procura de către Executant. Natura și cantitatea lucrărilor sunt conform Proiectului Tehnic. Se propune ca termenul de execuție să fie de 12 luni și perioada de valabilitate a contractului să fie până la data semnării Procesului Verbal de recepție finală.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

What this buyer has paid before

Based on 6 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€8.1M
Median award
€9.7M
Middle half of past awards
€8.5M to €11.0M

The award is smaller than three in four past awards.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Societatea Nationala de Transport Gaze Naturale TRANSGAZ SA

Romania

notices in the register
178
awards
72
awarded in total
€483.4M

Who wins its contracts

Many suppliers
different companies won its awards
55
of the awards went to the three most frequent winners
15%
of its calls state an estimated value
94%

Based on 67 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.6
of those lots received a single tender
25%
of the awards went to companies based in another country
2%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Awards most often to

  1. KIT METAL SRL 4 awards €5.7M
  2. ANVICO S.A. 4 awards €3.5M
  3. TOTALGAZ INDUSTRIE 2 awards €9.0M

8 open tenders right now

Market context

open now in Construction work
29,149
median open notice
€850,000

Who wins in this market

Many suppliers

Romania · Construction work

different companies won awards here
1,155
of the awards went to the three most frequent winners
6%
buyers awarded contracts here
404

Based on 1,663 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
3.5
of those lots received a single tender
19%
of the awards went to companies based in another country
2%
of the tenders came from another country
8%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Procedure facts

  • A single tender was received (open procedure).

Facts that procurement researchers and journalists track across public records. None of them is evidence of wrongdoing: each has ordinary explanations, such as a specialised market, an urgent need or a short list of qualified suppliers.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,993 new notices in Construction work in Romania in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language