Summary
Machine-generated summaryThe contract covers preparation of design documentation plus author's supervision for the investment task 'Rebuilding a section of railway line no. 285 by raising the track onto an engineering structure over Bardzka Street in Wroclaw', part of the 'Preparatory projects' project. Phase I includes a programmatic and spatial concept, obtaining final environmental, railway location or public purpose investment location and water-law decisions, building and execution designs with geotechnical and geological-engineering documentation and a building permit, tender materials (OPZ, bill of quantities, investor's cost estimate, technical specifications) and design-stage certification. Phase II is an option covering author's supervision during construction works. Duration is 21 months without the option and environmental assessment; Phase I takes 21 or 41 months depending on whether an environmental assessment is required, with a maximum of 62 months overall.
Description
Terms of the procedure
- How tenders are scored
- Cena: 100 percent
- Tenders go to
- platformazakupowa.plk-sa.pl
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Polish.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 14 hours ago
What this buyer has paid before
Based on 37 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €1.7M
- Middle half of past awards
- €594,297 to €3.5M
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Usługi inżynierii projektowej w zakresie inżynierii lądowej i wodnej - Zamówienie z wolnej ręki €731,128
- Usługi inżynieryjne w zakresie projektowania - Opracowanie projektu nowego układu geometrycznego linii nr 403 Piła Północ - Ulikowo na odcinku Piła Północ - Kalisz Pomorski, linii nr 405 Piła Główna - Ustka na odcinku Piła Główna - Piła Północ, linii nr 410 Grotniki Drawskie - Choszczno oraz linii nr 999 Piła Główna - Piła Północ wraz z niezbędnymi danymi dla przeprowadzenia regulacji osi toru oraz założenie znaków regulacji osi toru €447,471
- Usługi inżynieryjne w zakresie projektowania - Opracowanie projektu nowego układu geometrycznego linii nr 403 Piła Północ - Ulikowo na odcinku Piła Północ - Kalisz Pomorski, linii nr 405 Piła Główna - Ustka na odcinku Piła Główna - Piła Północ, linii nr 410 Grotniki Drawskie - Choszczno oraz linii nr 999 Piła Główna - Piła Północ wraz z niezbędnymi danymi dla przeprowadzenia regulacji osi toru oraz założenie znaków regulacji osi toru €447,850
- Usługi doradcze w zakresie wydajności energetycznej - Analizy wydajności układów zasilania układów trakcji elektrycznej dla perspektywicznych elektryfikacji linii kolejowych (Umowa Ramowa) €2,746,624
- Usługi inżynierii projektowej w zakresie inżynierii lądowej i wodnej - Opracowanie dokumentacji projektowej dla przebudowy infrastruktury pasażerskiej na stacji Piła Główna w ramach projektu pn.: „Projekty Przygotowawcze” €705,460
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profilePKP Polskie Linie Kolejowe S.A.
- notices in the register
- 891
- awards
- 238
- awarded in total
- €24.5B
Who wins its contracts
Many suppliers- different companies won its awards
- 138
- of the awards went to the three most frequent winners
- 7%
- of its calls state an estimated value
- 1%
Based on 185 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.4
- of those lots received a single tender
- 23%
- of the awards went to companies based in another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
This buyer has no award history in this sector yet. Usual winners, Architecture & engineering services - Poland
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| PBW INŻYNIERIA SP. Z O. O. | 37 | €4.7M | Sep 2026 |
| Sweco Polska sp. z o.o. | 36 | €23.5M | Sep 2026 |
| JNS Sp. z o.o. | 22 | Oct 2026 | |
| Via Ambra Sebastian Grabiński | 21 | €1.7M | Sep 2026 |
| SANMAT Sp. z o.o. | 21 | €32,095 | Oct 2026 |
Based on 6530 awards with a linked company profile over the last 2 years.
31 open tenders right now
- Telecommunications equipment maintenance services - Maintenance of railway radio communication equipment in 2027-2028 1 day left
- Construction works - Design and execution of works for the installation of the ERTMS/ETCS level 2 system on railway lines No. 133 and 91, section Krakow Glowny - Podleze 2 days left
- Construction works - Design and execution of works for the task 'Installation of the ERTMS/ETCS Level 2 system on railway lines no. 133 and 134, section Sosnowiec Jęzor - Kraków Główny' under the 'ERTMS system installation' project 2 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Architecture & engineering services
- 7,693
- median open notice
- €300,000
Who wins in this market
Many suppliersPoland · Architecture & engineering services
- different companies won awards here
- 3,906
- of the awards went to the three most frequent winners
- 1%
- buyers awarded contracts here
- 2,358
Based on 6,505 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.4
- of those lots received a single tender
- 23%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 2%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
448 new notices in Architecture & engineering services in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Engineering design services for the construction of civil engineering works: an email when new tenders arrive under it, no account needed.