Poland - Motorway and road construction works - Construction of the Chmielnik bypass on national roads DK 73 and DK 78, section Holendry - Chmielnik

Original Polska - Roboty w zakresie budowy autostrad, dróg - Budowa obwodnicy Chmielnika w ciągu DK 73 i DK 78 odc. Holendry - Chmielnik

Closed Poland Świętokrzyskie Construction work

Buyer Generalna Dyrekcja Dróg Krajowych i Autostrad

Key facts

Closed
09:00 (UTC+2)
Procedure
Open procedure
  1. Published
  2. Deadline open for 41 days
  3. Awarded pending
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

The works concern the construction of a bypass of Chmielnik in the Świętokrzyskie voivodeship, Kielce county, on the territory of the town and municipality of Chmielnik. The route starts on national road DK 78 at around km 227+975 and runs south-east to connect with DK 73 at around km 43+600. The works include building a new section of a class GP main accelerated traffic road, two small animal underpasses, reconstruction of crossing roads, additional carriageways for adjacent areas, road safety devices, footpaths, a drainage system with retention and evaporation reservoirs, one vehicle control and weighing station, technical infrastructure including technological ducts, and a traffic management system covering detour management and meteorological data collection. The contract value exceeds 20 million euros.

Description

Inwestycja zlokalizowana jest w województwie świętokrzyskim, powiecie kieleckim, na terenie Miasta i Gminy Chmielnik. Planowana inwestycja rozpoczyna się w km 4+300 w obrębie drogi krajowej nr 78 w km ok. 227+975, następnie przebiega w kierunku południowo-wschodnim. Koniec projektowanej obwodnicy zlokalizowany jest w km ok. 43+600 DK nr 73. Trasa projektowanego wariantu przebiega w terenie płaskim i falistym. Realizacja ww. odcinka drogi umożliwi poprowadzenie ruchu tranzytowego omijającego gęstą zabudowę, zlokalizowaną wzdłuż istniejącej drogi. Budowa obwodnicy miejscowości Chmielnik, obiektów inżynierskich, w tym przejść dla zwierząt, jezdni dodatkowych do obsługi terenów przyległych poprawi warunki ruchu oraz zwiększy poziom bezpieczeństwa ruchu drogowego. Zakres rzeczowy zadania obejmuje: • budowę odcinka drogi głównej ruchu przyśpieszonego klasy GP, po nowym śladzie - obwodnica miejscowości Chmielnik; • budowa 2 obiektów inżynierskich: - 1 przejście dolne dla zwierząt małych PZM-10 o długości ok. 17m, świetle poziomym ok 1,5m, współczynnik względnej ciasnoty ≥ 0,09, - 1 przejście dolne dla zwierząt małych PZDs-11 o długości ok. 17m, świetle poziomym ok 6,0m, świetle pionowym ok. 3,5m, współczynnik względnej ciasnoty ≥ 1,25, • przebudowę istniejących dróg krzyżujących się z budowaną drogą głównej ruchu przyśpieszonego; • budowę dodatkowych jezdni/innych dróg publicznych do obsługi przyległego terenu; • budowę urządzeń bezpieczeństwa ruchu; • budowę chodników; • budowę systemu odwodnienia, w tym: zbiorników retencyjno-odparowujących, • budowę 1 miejsca kontroli i ważenia pojazdów, • budowę i przebudowę infrastruktury technicznej związanej i niezwiązanej z drogą, w tym kanałów technologicznych, a niezbędnej do realizacji inwestycji, • System Zarządzania Ruchem, w zakresie: kanałów technologicznych, koncepcji systemu zarządzania ruchem, zarządzania objazdami, pozyskiwania danych meteorologicznych, itp. Wartość zamówienia powyżej 20 mln euro

Terms of the procedure

How tenders are scored
Price: 100 percent

As the official notice states them.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

Generalna Dyrekcja Dróg Krajowych i Autostrad

Poland

notices in the register
1,118
awards
352
awarded in total
€19.8B

Who wins its contracts

Many suppliers
different companies won its awards
211
of the awards went to the three most frequent winners
8%
of its calls state an estimated value
0%

Based on 302 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.0
of those lots received a single tender
21%
of the awards went to companies based in another country
2%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. KM Management Group Sp. z o.o. 9 awards €941,337
  2. Zaberd Sp. z o.o. 8 awards €33.2M
  3. PORR S.A. 6 awards €346.3M

41 open tenders right now

Market context

open now in Construction work
19,943
median open notice
€533,524

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,454
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,146

Based on 28,089 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,245 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work for highways, roads: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language