Poland - Motorway and road construction works - Construction of road S16 Olsztyn (S51) - Elk (S61), section Olsztyn - Biskupiec (construction of the second carriageway), section Barczewo - Biskupiec

Original Polska - Roboty w zakresie budowy autostrad, dróg - Budowa drogi S16 Olsztyn (S51) - Ełk (S61) odcinek Olsztyn - Biskupiec (budowa drugiej jezdni) odcinek Barczewo - Biskupiec

Awarded Poland Construction work

Buyer Generalna Dyrekcja Dróg Krajowych i Autostrad ul. Wronia 53, 00-874 Warszawa, Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Olsztynie

€104.6M awarded value · €104,582,149

Key facts

Awarded
  1. Awarded
  2. Published
  3. Contract ends, estimated January 2027
View the official notice Watch this tender

This contract runs about 39 months, so it is back on the market around January 2027. Log in

Awarded to

Awarded value
€104,582,149
Award date
Back on the market
Jan 2027 How we know

When this contract comes back

estimated from the stated duration

This contract runs about 39 months, so it is back on the market around January 2027.

Every contract expiring, on the radar

Summary

Machine-generated summary

The contracting authority, the General Directorate for National Roads and Motorways, awarded a design and build contract for the construction of the second carriageway of express road S16 on the section Barczewo - Biskupiec, from km approximately 13+600 to km approximately 31+800 of national road no. 16, covering 18.2 km. The estimated total order of magnitude of the contract value was above EUR 20,000,000. The awarded value was about EUR 104,582,149.48, converted from PLN at the ECB reference rate. The contract was awarded on 2023-10-05 and runs for 39 months, so it is expected to end and come back to market on 2027-01-04.

Description

Przedmiotem zamówienia jest realizacja zadania pod nazwą „Budowa drogi S16 Olsztyn (S51) - Ełk (S61) odcinek Olsztyn - Biskupiec (budowa drugiej jezdni) odcinek Barczewo - Biskupiec”. Przedmiotem zamówienia jest zaprojektowanie i budowa drogi ekspresowej S16 na odcinku od km około 13+600 drogi krajowej nr 16c tj. za węzłem Barczewo, pomiędzy miejscowościami Ruszajny i Czerwony Dwór do km około 31+800, zgodnie z istniejącym pikietażem drogowym DK 16. Długość odcinka - 18,2 km. Całkowity szacunkowy rząd wielkości wartości zamówienia: powyżej 20.000.000 euro.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Poland.

This award
€104.6M
Median award
€3.7M
Middle half of past awards
€700,413 to €9.7M

The award is larger than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Generalna Dyrekcja Dróg Krajowych i Autostrad ul. Wronia 53, 00-874 Warszawa, Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Olsztynie

Poland

notices in the register
2
awards
2
awarded in total
€210.7M

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Market context

open now in Construction work
20,149
median open notice
€549,804

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,540
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,160

Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,235 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work for highways, roads: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language