Summary
Machine-generated summaryThe contract covers the design and execution of construction works for railway line no. 622 Gdow - Szczyrzyc (section G, from km 17+487 to km 32+854) with technical infrastructure along the line from km 17+036 to km 32+973, and railway line no. 623 Fornale junction - Szczyrzyc (km 9+668 to km 10+105) with technical infrastructure along the same section. Works include design and as-built documentation, track and subgrade, drainage and hydrotechnical works, external networks, roads, rail traffic control, telecommunications, overhead catenary and power supply, non-traction power lines, low-voltage installations, engineering structures including tunnels, platforms, passenger buildings, level crossings, geological and geotechnical works, small architecture, tree clearance and environmental works, plus conformity assessment of subsystems with EC declarations and certificates. An option covers interface cooperation.
Description
Terms of the procedure
- How tenders are scored
- Price
- Tenders go to
- platformazakupowa.plk-sa.pl/
As the official notice states them.
Bid or no-bid?
Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.
Can I bid?
- Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
- The notice is written in Polish.
- Certificates from another EU country? Check the equivalents on eCertis
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago
What this buyer has paid before
Based on 85 comparable contracts this buyer awarded in this sector over the last 4 years.
- Median award
- €24.1M
- Middle half of past awards
- €5.8M to €91.1M
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.
Most recent awards
- Roboty budowlane - „Zaprojektowanie i wykonanie robót w ramach zadania pn.:” Prace na linii kolejowej numer 404 na odcinku Białogard - Kołobrzeg wraz z robotami towarzyszącymi realizowanego w ramach projektu „poprawa bezpieczeństwa i likwidacja zagrożeń eksploatacyjnych na sieci kolejowej -ETAP II” €7,922,984
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Remont sieci trakcyjnej w dwóch lokalizacjach: 1. Remont sieci trakcyjnej poprawa stanu infrastruktury kolejowej na linii kolejowej nr 714 w km 0,000 - 4,323 w wybranych lokalizacjach wraz z robotami towarzyszącymi; 2. Poprawa parametrów eksploatacyjnych sieci trakcyjnej na linii kolejowej nr 139 odcinek Czechowice Dziedzice - Bielsko-Biała €638,136
- Roboty budowlane - Wymiana szyn z ciągłą wymianą podkładów na odcinku Jabłonowo Pomorskie - Mełno w km 79,085-101,400 linii kolejowej nr 208 Działdowo-Chojnice wraz z robotami towarzyszącymi. €9,241,715
- Construction works - Design documentation and construction works for the modernisation of railway line no. 16 Łęczyca - Kutno €70,213,238
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profilePKP Polskie Linie Kolejowe S.A.
- notices in the register
- 891
- awards
- 238
- awarded in total
- €24.5B
Who wins its contracts
Many suppliers- different companies won its awards
- 138
- of the awards went to the three most frequent winners
- 7%
- of its calls state an estimated value
- 1%
Based on 185 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.4
- of those lots received a single tender
- 23%
- of the awards went to companies based in another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
This buyer has no award history in this sector yet. Usual winners, Construction work - Poland
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Strabag Sp. z o.o. | 277 | €1.2B | Oct 2026 |
| Przedsiębiorstwo Robót Drogowych Sp. z o.o. | 111 | €4.7M | Oct 2026 |
| Przedsiębiorstwo Robót Drogowo-Mostowych sp. z o.o. | 87 | €35.3M | Oct 2026 |
| COLAS POLSKA Sp. z o.o. | 83 | €23.9M | Oct 2026 |
| POL-DRÓG S.A. | 80 | €13.6M | Oct 2026 |
Based on 28647 awards with a linked company profile over the last 2 years.
31 open tenders right now
- Telecommunications equipment maintenance services - Maintenance of railway radio communication equipment in 2027-2028 1 day left
- Construction works - Design and execution of works for the installation of the ERTMS/ETCS level 2 system on railway lines No. 133 and 91, section Krakow Glowny - Podleze 2 days left
- Construction works - Design and execution of works for the task 'Installation of the ERTMS/ETCS Level 2 system on railway lines no. 133 and 134, section Sosnowiec Jęzor - Kraków Główny' under the 'ERTMS system installation' project 2 days left
Market context
TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.
- open now in Construction work
- 20,109
- median open notice
- €537,478
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,606
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,176
Based on 28,474 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
2,177 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.