Awarded to
- Awarded value
- €1,031,881 3% over the estimate of €1,001,195
- Award date
- Bids received
- 2
- Record with this buyer
- 1 first contract from this buyer in the register
- Back on the market
- Jul 2027 How we know
When this contract comes back
estimated from the stated durationThis contract runs about 12 months, so it is back on the market around July 2027.
Every contract expiring, on the radarSummary
Machine-generated summaryThe State Treasury, acting through the General Director for National Roads and Motorways together with the Minister of Finance and Economy, awarded a design and build contract on 21 July 2026. The works covered the design and demolition of six toll collection points (SPO Przylesie, Prądy, Dąbrówka, Gogolin, Olszowa and Nogowczyce) on the Opole section of the A4 motorway, disposal of the resulting infrastructure, and restoration of the road to the standards for its class, including changes to traffic organisation. GRAMAR Sp. z o.o. won the 12-month contract for about EUR 1,031,880.55, converted from PLN at the ECB reference rate, which is 3% above the estimate of PLN 4,341,683.40 (about EUR 1,001,195.30, converted from PLN). The contract is expected to end on 20 July 2027, when the work comes back to market.
Description
Terms of the procedure
- How tenders are scored
- Price: 80 points; Quality: 20 points
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago
What this market pays
The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Poland.
- This award
- €1.0M
- Estimated value
- €1.0M
- Median award
- €3.7M
- Middle half of past awards
- €700,413 to €9.7M
The award sits inside the usual range.
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileGeneralna Dyrekcja Dróg Krajowych i Autostrad; Skarb Państwa - Minister Finansów i Gospodarki
- notices in the register
- 7
- awards
- 2
- awarded in total
- €3.3M
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Recent awards
Market context
- open now in Construction work
- 20,109
- median open notice
- €537,478
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,606
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,176
Based on 28,474 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
2
days left
€1,382,482
est. value
Awarded before
Never miss a tender like this
2,183 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work: an email when new tenders arrive under it, no account needed.