Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 2 days ago Modification

Poland - Construction works for sports facilities - Construction of an indoor swimming pool in Działdowo

Original Polska - Roboty budowlane w zakresie budowy obiektów sportowych - Budowa krytego basenu w Działdowie

Awarded Poland Warmińsko-mazurskie Construction work

Buyer GMINA-MIASTO DZIAŁDOWO

€10.3M awarded value · €10,288,173

Key facts

Awarded
  1. Awarded
  2. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

Awarded value
€10,288,173
Award date

Summary

Machine-generated summary

The Municipality of Działdowo awarded a contract for the construction of an indoor swimming pool in Działdowo, including sanitary and changing facilities, a SPA area, external site development, and the preparation of the as-built project documentation. The facility will include a six-lane sports pool, a recreational pool, a children's paddling pool, a jacuzzi, a 55 m tube slide, lifts for disabled users, and saunas. The contract was awarded on 2024-02-05 for EUR 10,288,172.72.

Description

Przedmiotem zamówienia jest budowa krytego basenu w Działdowie Przedmiot zamówienia obejmuje budowę krytego basenu w Działdowie z zapleczem sanitarno-szatniowym i zespołem SPA wraz z wykonaniem Wykonawczej Dokumentacji Projektowej. Szczegółowy opis przedmiotu zamówienia w Specyfikacji Warunków Zamówienia. 4.2 Przedmiot zamówienia obejmuje budowę krytego basenu w Działdowie z zapleczem sanitarno-szatniowym i zespołem SPA wraz z wykonaniem Wykonawczej Dokumentacji Projektowej. 4.2.1 Lokalizacja: działka nr 167/11. 4.2.2 Obiekt będzie budynkiem wolnostojącym, dwukondygnacyjnym, podpiwniczonym. Podstawowa funkcja to usługi rekreacyjne - baseny z zapleczem szatniowo-sanitarnym i technicznym. 4.2.3 W ramach zagospodarowania terenu przewiduje się budowę: miejsc postojowych dla samochodów osobowych, w tym dla osób niepełnosprawnych, miejsc dla autobusów, boksu śmietnikowego, ogrodzenia, zewnętrznych instalacji wod.-kan., elektrycznych, w tym przyłączy. Zakłada się wykorzystanie wody opadowej do podlewania terenów zielonych. Zaprojektowano drogi wewnętrzne o szer.6, 5 i 4 m, chodniki o szer.2 m. Pow. Zabudowy budynku pływalni - ok. 2300 m2, pow. netto ok. 3900 m2. 4.2.4 Budynek został zaprojektowany równolegle do ulicy Hallera, od tej strony będzie główne wejście do budynku. Przy wejściu zlokalizowany będzie hol i punkt rozliczeń - wejście w obszar basenowo szatniowy. Z holu dostępne będą toalety, punkt małej gastronomii z zapleczem oraz administracja obiektu. W hali basenowej zaprojektowano basen sportowy 6-cio torowy o pow. ok 312,5 m2 z niecką stalową, basen rekreacyjny o powierzchni lustra wody ok. 84,5 m2 z basenem do nauki pływania o pow. ok. 40 m2, brodzik dla dzieci o pow. ok 32 m2, wannę jacuzzi oraz zjeżdżalnię rurową ok 55 m z basenem hamownym, 2 podnośniki basenowe do transportu osób niepełnosprawnych. Z hali dostępny będzie zespół SPA z jacuzzi oraz pomieszczenie z tężnią solankową i leżankami. Przewidziano saunę IR, fińską, łaźnię parową, basen schładzający, zespół natrysków i prysznic wrażeń. Ze strefy SPA dostępny będzie taras wypoczynkowy. 4.2.5 Na kondygnacji piwnicy zaprojektowano pomieszczenia techniczne i socjalne a na tarasie basenowym mokry plac zabaw, wyposażony w zestaw zabawek tryskających wodą. 4.2.6 Budynek zostanie wyposażony zgodnie z posiadanym projektem wykończenia i wyposażenia wnętrz. Ponadto będzie posiadał serwer, system ESOK, pom. dla ratowników i administracji. Dostosowany będzie do osób niepełnosprawnych (winda) oraz będzie spełniał wszystkie standardy techniczne i sanitarne. Zostanie wyposażony w instalacje: elektryczną oświetlenia oraz zasilania urządzeń i wyposażenia, odgromową i uziemienia, ogrzewania, kanalizacji sanitarnej, wodociągową, wentylacji i klimatyzacji, teletechniczną i technologii uzdatniania wody basenowej, OZE. 4.2.7 Teren zostanie wyposażony z zieleń Zamówienie jest dofinansowane ze środków Rządowego Funduszu Polski Ład: Program Inwestycji Strategicznych oraz Programu Sportowa Polska. Szczegółowy opis przedmiotu zamówienia został zawarty w Specyfikacji Warunków Zamówienia.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 2,000 awards for Construction work in Poland.

This award
€10.3M
Median award
€3.7M
Middle half of past awards
€700,413 to €9.7M

The award is larger than three in four past awards.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

GMINA-MIASTO DZIAŁDOWO

Poland

notices in the register
38
awards
20
awarded in total
€10.3M

Who wins its contracts

Moderately concentrated
different companies won its awards
13
of the awards went to the three most frequent winners
38%
of its calls state an estimated value
0%

Based on 16 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. Wojciech Zgliczyński Zakład Betoniarski 3 awards
  2. Usługi Remontowo-Budowlane Wiesław Zdzisław Dawid 2 awards
  3. ENERGA Oświetlenie Sp. z o.o. 1 award

Market context

open now in Construction work
19,866
median open notice
€534,464

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,540
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,160

Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,244 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work for sports facilities: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language