Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 week ago Contract award

Polska - Roboty budowlane w zakresie budowy mostów i tuneli, szybów i kolei podziemnej - S6 Zachodnie drogowe obejście Szczecina - Odcinek 3 Police - Goleniów (od km 27+403 do km 50+810,20)

Awarded Poland Zachodniopomorskie Construction work

Buyer Generalna Dyrekcja Dróg Krajowych i Autostrad

€1.2B awarded value · €1,233,444,630

Key facts

Published
Procedure
Open procedure
  1. Published
  2. Awarded pending

TED - Tenders Electronic Daily (Publications Office of the EU) does not publish the date of this award. See the official notice

View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Awarded to

NDI S.A.; DOĞUŞ İNŞAAT VE TİCARET A.Ş.; DOGUS CONSTRUCTION POLAND Sp. z o.o.

Awarded value
€1,233,444,630
Bids received
5
Record with this buyer
1 first contract from this buyer in the register

Description

W zakres przedmiotu zamówienia wchodzi przygotowanie koniecznych opracowań projektowych (m.in. projektu technicznego oraz projektu wykonawczego) na podstawie projektu budowlanego (PB) zatwierdzonego decyzją o zezwoleniu na realizację inwestycji drogowej oraz budowa drogi ekspresowej o długości ok. 23,407 km na odcinku od km 27+403 do km 50+810,20 wraz z dwunawowym tunelem pod Odrą. W ramach zadania należy zrealizować mi.in. węzły drogowe: Police i Modrzewie oraz rozbudowę węzła typu WA Goleniów Północ, MOP „Bolesławice”, Obwód Utrzymania Drogi (OUD) z budynkiem administracyjno-socjalnym i budynkami towarzyszącymi oraz Budynek Centrum Zarządzania Tunelem, przebudowę istniejących dróg w zakresie kolizji z drogą ekspresową, budowę lub/i przebudowę infrastruktury dla pieszych i rowerzystów, obiekty inżynierskie w ciągu drogi ekspresowej i w ciągu dróg krzyżujących się z drogą ekspresową, system odwodnienia terenu, urządzenia ochrony środowiska, sieci energetyczne zasilające i oświetleniowe, sieci wodociągowe, sieci i urządzenia oczyszczające ścieki, kanalizację deszczową wraz z urządzeniami podczyszczającymi, dodatkowe zasilanie fotowoltaiczne, dodatkowe zasilanie agregatami i inne, przebudowę kolidujących urządzeń i sieci istniejącej infrastruktury pod i nadziemnej, sieć teletechniczną na potrzeby Zamawiającego, wraz z uzbrojeniem światłowodowym, oświetlenie drogowe, System Zarządzania Ruchem (SZR), wraz z odcinkami dróg ruchu szybkiego S3 od węzła Goleniów północ do węzła Radziszewo oraz A6 od węzła Radziszewo do węzła Szczecin Zachód, Systemu Zarządzania Bezpieczeństwem i Ruchem w tunelu, wzmocnienie podłoża gruntowego i zapewnienie stateczności skarp wykopów i nasypów. Całkowity szacunkowy rząd wielkości wartości zamówienia powyżej 20 000 000 euro. Zamawiający zastrzega obowiązek osobistego wykonania przez Wykonawcę kluczowych zadań, tj. a) nawierzchni trasy głównej łącznie z wytworzeniem i wbudowaniem oraz wykonanie pozostałych warstw konstrukcji nawierzchni powyżej gruntu rodzimego (wykop) lub nasypowego (nasyp), z wyłączeniem dostaw materiałów i usług. b) konstrukcję tunelu z wyłączeniem dostaw materiałów i usług. W odniesieniu do kluczowych zadań zastrzeżonych do osobistego wykonania przez Wykonawcę, Wykonawca nie może powoływać się na zdolności podmiotu udostępniającego zasoby, na zasadach określonych w art. 118 ust. 1 ustawy Pzp, w celu wykazania spełniania odnośnych warunków udziału w postępowaniu.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

What this buyer has paid before

Based on 63 comparable contracts this buyer awarded in this sector over the last 4 years.

This award
€1.2B
Median award
€48.5M
Middle half of past awards
€16.1M to €90.9M

The award is larger than three in four past awards.

Most recent awards

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

Generalna Dyrekcja Dróg Krajowych i Autostrad

Poland

notices in the register
1,119
awards
352
awarded in total
€19.8B

Who wins its contracts

Many suppliers
different companies won its awards
211
of the awards went to the three most frequent winners
8%
of its calls state an estimated value
0%

Based on 302 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.0
of those lots received a single tender
21%
of the awards went to companies based in another country
2%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. KM Management Group Sp. z o.o. 9 awards €941,337
  2. Zaberd Sp. z o.o. 8 awards €33.2M
  3. PORR S.A. 6 awards €346.3M

42 open tenders right now

Market context

open now in Construction work
19,765
median open notice
€554,000

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,540
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,160

Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,252 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work for bridges and tunnels, shafts and subways: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language