Poland - Repair of the bridge over an unnamed watercourse in Karczmiska, provincial road no. 824 km 34+588

Original Polska - Roboty budowlane w zakresie budowy mostów i tuneli, szybów i kolei podziemnej - Remont mostu przez ciek bez nazwy w m. Karczmiska, w ciągu drogi wojewódzkiej nr 824 km 34+588

Closed Poland Lubelskie Construction work

Buyer Zarząd Dróg Wojewódzkich w Lublinie Rejon Dróg Wojewódzkich w Puławach

Key facts

Closed
09:00 (UTC+2)
Procedure
Open procedure
  1. Published
  2. Deadline open for 10 days
  3. Awarded pending
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

The contract covers the repair of a bridge over an unnamed watercourse in Karczmiska, located along provincial road no. 824 at km 34+588. The scope of works includes surveying, demolition of existing barriers, road surfaces and abutment wings, earthworks and concrete repairs. The project involves repairing bridge supports, applying protective coatings, installing transition slabs, reinforcing steel girders, making waterproofing and drainage elements. Eligibility to bid depends on the specific procurement rules of the contracting authority.

Description

Remont mostu przez ciek bez nazwy w m. Karczmiska, w ciągu drogi wojewódzkiej nr 824 km 34+588 Kod CPV: 45221000-2 Roboty budowlane w zakresie budowy mostów i tuneli, szybów i kolei podziemnej; 45233000-9 Roboty w zakresie konstruowania, fundamentowania oraz wykonywania nawierzchni autostrad, dróg; 45111000-8 Roboty w zakresie burzenia, roboty ziemne; 45112000-5 Roboty w zakresie usuwania gleby; 1. Zakres robót obejmuje: a) roboty pomiarowe b) roboty rozbiórkowe:  rozebranie barier ochronnych,  rozebranie nawierzchni jezdni oraz izolacji na moście,  rozebranie korpusu drogowego w obrębie obiektu  frezowanie nawierzchni na dojazdach do obiektu,  rozebranie warstwy wyrównawczej z betonu,  rozebranie wsporników płyty pomostu,  rozebranie skrzydeł przyczółków,  rozebranie umocnienia stożków,  rozebranie zabudowy chodnikowej i krawężników,  usunięcie zanieczyszczeń oraz skucie skorodowanego betonu na powierzchniach ustroju niosącego,  rozebranie umocnień ścieków skarpowych, schodów roboczych. c) roboty ziemne d) roboty remontowe na obiekcie:  remont skrzydeł i przyczółków,  naprawę uszkodzeń powierzchni podpór mostu wraz z reprofilacją zaprawami naprawczymi i zabezpieczeniem powierzchni betonowych powłokami ochronnymi: wykonanie powłok nawierzchniowo-izolacyjnych kap z żywic syntetycznych, powłok ochronnych na bazie cementu na pozostałych powierzchniach betonowych dodatkowo elementy stalowe ustroju zabezpieczyć systemem malarskim,  zabezpieczenie izolacją lekką powierzchni betonowych stykających się z gruntem,  wykonanie płyt przejściowych podpartych pośrednio na kolumnach betonowych,  wykonanie warstwy nad-betonu zespolonego z istniejącą płytą ustroju nośnego oraz wzmocnienie dźwigarów stalowych poprzez przyspawanie blach stalowych,  wykonanie wsporników płyty pomostu,  wykonanie izolacji przeciwwodnej ustroju niosącego,  wykonanie dylatacji bitumicznych,  wykonanie elementów odwodnienia płyty ustroju niosącego,  wykonanie kap gzymsowych,  ustawienie krawężników na dojazdach i obiekcie,  ustawienie barier ochronnych na obiekcie i dojazdach,  wykonanie punktów pomiarowych,  remont przyobiektowych ścieków skarpowych,  wykonanie przyobiektowych technologicznych schodów skarpowych wraz z balustradą,  remont stożków przyobiektowych wraz z umocnieniem,  wykonanie warstw nawierzchni na obiekcie,  odtworzenie oznakowania poziomego na obiekcie i dojazdach. e) roboty drogowe:  wykonanie warstw nawierzchni na dojazdach,  remont istniejących chodników za i przed obiektem,  uzupełnienie skarp,  humusowanie oraz obsianie skarp, f) prace hydrotechniczne:  oczyszczenie koryta cieku z zanieczyszczeń,  odtworzenie skarp cieku.

Terms of the procedure

How tenders are scored
Price; Quality

As the official notice states them.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago

Zarząd Dróg Wojewódzkich w Lublinie Rejon Dróg Wojewódzkich w Puławach

Poland

notices in the register
44
awards
14
awarded in total
€5.3M

Who wins its contracts

Moderately concentrated
different companies won its awards
12
of the awards went to the three most frequent winners
36%
of its calls state an estimated value
0%

Based on 14 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.5
of those lots received a single tender
0%
of the awards went to companies based in another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

Awards most often to

  1. WOD-BUD Sp. z o.o. 2 awards €2.0M
  2. Mosty Zamość Tomasz Czyż 2 awards €345,315
  3. PBI INFRASTRUKTURA S.A. 1 award €1.6M

1 open tender right now

Market context

open now in Construction work
19,748
median open notice
€550,000

Who wins in this market

Many suppliers

Poland · Construction work

different companies won awards here
13,540
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
6,160

Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
12%
of the awards went to companies based in another country
1%
of the tenders came from another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

2,252 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Construction work for bridges and tunnels, shafts and subways: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language