Summary
Machine-generated summaryThe contract covers the comprehensive turnkey execution of the project 'Design, supply and construction of the PV Lubno III photovoltaic installation with an installed capacity of up to 48 MW', including a GPO substation. The scope includes all construction and electrical works and the necessary design work. Supply of photovoltaic panels and inverters is excluded and provided by the contracting authority, while their placement and installation remain the contractor's responsibility. The contractor must complete all tasks and obligations under agreements, decisions and permits needed to start up the installation, carry out inspections and tests required by the contracting authority, panel manufacturers and the distribution system operator, and obtain missing permits. The installation must qualify as a renewable energy source under the Polish RES Act.
Description
Terms of the procedure
- How tenders are scored
- Price: 100 percent
- Small firms
- The buyer marks this procedure as suitable for small and medium-sized firms.
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago
The buyer
Full buyer profileENEA Nowa Energia sp. z o.o.
- notices in the register
- 26
- awards
- 4
- awarded in total
- €622,633
Who wins its contracts
- of its calls state an estimated value
- 0%
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Recent awards
3 open tenders right now
- Construction work for power plants: design and build of photovoltaic installations PV Skalin 1 and PV Gryfice 2 and electricity storage facilities ME Skalin 1 and ME Gryfice 2 1 day left
- Construction work for power plants: design, supply and construction of PV Skalin 1 and PV Gryfice 2 photovoltaic installations and energy storage facilities ME Skalin 1 and ME Gryfice 2 8 days left
- Installation of electrical and mechanical equipment - Comprehensive execution of the project 'Modernisation of gates, screens and control system at the Żur hydropower plant water dam' 13 days left
Market context
- open now in Construction work
- 19,748
- median open notice
- €550,000
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,540
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,160
Based on 28,280 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
2,268 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work for power plant: an email when new tenders arrive under it, no account needed.