Summary
Machine-generated summaryConstruction of a photovoltaic farm with a capacity of 436.17 kW and accompanying infrastructure for the 'Centrum' wastewater treatment plant in Mikolow, Poland. The works include construction and assembly based on the design documentation, a cable route to a transformer station across plots owned by the investor, connection of the new farm to a newly installed switchgear at the treatment plant, and coordination with TAURON Polska Energia S.A. to connect the farm to the existing power grid. The scope also covers required tests, commissioning and start-up, as-built inventory, and preparation of documents for handing the installation into use. The farm is an unmanned facility producing electricity from panels mounted on prefabricated steel support structures.
Description
Terms of the procedure
- How tenders are scored
- Cena: 100 percent
- Small firms
- The buyer marks this procedure as suitable for small and medium-sized firms.
As the official notice states them.
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 days ago
The buyer
Full buyer profileZakład Inżynierii Miejskiej Sp. z o.o. w Mikołowie
- notices in the register
- 7
1 open tender right now
Market context
- open now in Construction work
- 20,236
- median open notice
- €550,318
Who wins in this market
Many suppliersPoland · Construction work
- different companies won awards here
- 13,672
- of the awards went to the three most frequent winners
- 2%
- buyers awarded contracts here
- 6,185
Based on 28,664 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 5.0
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
- of the tenders came from another country
- 3%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
2,178 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alertOr follow just its CPV code, Construction work for power plant: an email when new tenders arrive under it, no account needed.