The Aperlena Verdict
Open raceNo supplier dominates: 4 different companies have won the last 5 comparable contracts from this buyer over 5 years. This is a genuinely open race.
- Expected final price vs the published estimate
- -23.1%
Based on 5 comparable awards by this buyer in this sector over 5 years. Every verdict is recorded before the outcome and graded against the award notice. How we score ourselves.
Summary
Machine-generated summaryThe contracting authority is procuring design documentation, construction works, commissioning permits and handover for operation of the power supply infrastructure for high-speed rail on the Warsaw - Lodz and Sieradz - Wroclaw railway sections in Poland. The scope includes three traction substations of the NN/2x25 kV system: PT CPK (400/2x25 kV) and PT Dmosin (220/2x25 kV) for the Warsaw - Lodz section and PT Kuznica-Czajkow (400/2x25 kV) for the Sieradz - Wroclaw section, plus high-voltage cable lines connecting the substations to PSE S.A. substations, autotransformer cabins, fibre optic backbone, and teletechnical, automation and control systems including telemechanics, SCADA and communications. The contract includes an option for post-warranty maintenance. The procedure is a competitive dialogue after which the contract terms will be finalised.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile52 open tenders right now
- Software packages and IT systems - Purchase of subscription to design platform and software with support and development services 21 days left
- Construction works - Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/15 kV), GPO-C substation building, generator substation buildings and 110 kV cable lines No deadline published
- Construction works - Design, construction and equipping (supply and installation of systems and devices) of high-speed railway lines No. 85 and 86 in the fields of railway traffic control, teletechnics and related trades No deadline published
Who usually wins this buyer's contracts in this sector
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| Budimex S.A. | 2 | €46.3M | Aug 2026 |
| TRACK TEC CONSTRUCTION sp. z o.o.; UNIBEP Spółka Akcyjna | 1 | €33.3M | Oct 2025 |
| TRAKCJA S.A. | 1 | €25.6M | Oct 2025 |
| DUNA POLSKA S.A. | 1 | €21.6M | Sep 2025 |
Based on 5 awards with a linked company profile over the last 5 years.
What this buyer has paid before
Based on 5 comparable contracts this buyer awarded in this sector over the last 4 years.
- Lower quartile
- €21.6M
- Median award
- €25.6M
- Upper quartile
- €26.4M
Most recent awards
- Construction of complete buildings or parts thereof and civil and water engineering works - Relocation of the PG-31 ditch channel with reconstruction of drainage facilities and construction of a dry flood-retention reservoir on the final section of the relocated PG-3 ditch €19,928,559
- Roboty budowlane - Zaprojektowanie i wykonanie budowy bocznicy kolejowej i robót towarzyszących dla projektu pn. „Budowa Centralnego Portu Komunikacyjnego wraz z urządzeniami i obiektami niezbędnymi do jego funkcjonowania - budowa bocznicy kolejowej na odcinku linia kolejowa nr 3 - Centralny Port Komunikacyjny €33,255,906
- Roboty w zakresie budowy autostrad, dróg - Budowa korytarzy transportowych dojazdowych przy budowie Centralnego Portu Komunikacyjnego - ETAP 3 €25,648,837
- Roboty w zakresie budowy autostrad, dróg - Budowa korytarzy transportowych dojazdowych przy budowie Centralnego Portu Komunikacyjnego - ETAP 1 €21,599,267
- Roboty budowlane - Budowa konstrukcji komory Fabrycznej PLK w ramach Projektu „Budowa tunelu dalekobieżnego w Łodzi w ciągu linii kolejowej nr 85 wraz z włączeniem w linię kolejową nr 14 - budowa konstrukcji oporowej komory Retkinia oraz konstrukcji oporowej komory rozjazdowej Fabryczna" €26,369,540
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
Change history
Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.
-
Read before bidding
- Scope and criteria: The description was expanded. Re-read it before you bid.
Follow this tender and we email you the moment it changes. Create account
Similar tenders
Market context
- Avg. open tender · Construction work
- €32,043,125
- Buyer track record on Aperlena
- 105 notices tracked · 25 awarded
- €187,168,969 in awarded contracts