Poland - Fabrication of AP1000 Safety-Related Shield Building Steel and Concrete Composite (SC) Wall Panels (SC40) for Poland AP 1000 Project - Units 2 and 3

Original Poland - Structures and parts of structures - Fabrication of AP1000 Safety-Related Shield Building Steel and Concrete Composite (SC) Wall Panels (Commodity Code SC40) for Poland AP 1000® Project - Unit 2 & 3

Open Contract notice

Key facts

Closes in
15 days
Where
Poland Pomorskie
Procedure
Open procedure Anyone may submit a bid, in one step, with no pre-selection. Full entry Above the EU threshold A contract large enough that EU-wide rules apply and it must be published on TED. Full entry
CPV code The EU's common vocabulary for what is being bought: an eight-digit code every notice carries. Full entry
44210000 Structures and parts of structures
Original language
English
Source
via TED - Tenders Electronic Daily (Publications Office of the EU), verified 10 hours ago
Notice number
651178-2026
Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

  1. Published
  2. Today
  3. Deadline open for 21 days
  4. Awarded pending

Summary

Machine-generated summary

Westinghouse seeks qualified manufacturers to fabricate and supply Shield Building SC wall panels for the AP1000 nuclear project in Poland, Units 2 and 3. The Shield Building surrounds the containment building in the Nuclear Island and uses concrete-filled steel plate construction. The SC40 scope covers the cylindrical wall panels: 167 fabricated panels per unit, arranged in 56 unique groups, weighing 12 to 23 metric tonnes each, with 19.1 mm to 25.4 mm steel plates, tie bars, tie plates and shear studs, plus misc. structural components. The work is safety related, Seismic Category I, per ANSI/AISC N690-1994 and ACI 349-01. Interested fabricators must complete an AP1000 supplier qualification questionnaire.

Description

The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rolled carbon steel plates, welded tie bars, welded tie plates, and welded shear studs. Each SC panel weighs between 12 and 23 metric tonnes. The SC40 scope of supply also includes misc. structural components such as embedment plates, gusset plates, attachment plates, and nuts/washers. The SC40 Shield Building SC Wall Panels scope is classified as Safety Related, Seismic Category I, and Westinghouse Safety Class C. The governing codes and standards include ANSI/AISC N690-1994 and ACI 349-01. 1. Experienced manufacturers / Fabricators capable of fabricating and furnishing AP1000® structural modules and / or Shield Building (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar scopes in large carbon steel fabrication such as sub-modules that are approximately 11.8 m L x 3.1 m W x 1 m T, workshops having >25 tonne crane capacity), stud shooting, welding of ASTM A706 reinforcing steel, welding of high strength carbon steel, and equipment capabilities to roll and handle plate 25.4 mm T x 3.1 m W x 11.8 m L; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with NQA-1 and 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for Units 2 & 3 of the three (3) unit projects. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam but welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase. 12. Any companies that do not meet mandatory compliance requirements in section 3 will Description: The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rolled carbon steel plates, welded tie bars, welded tie plates, and welded shear studs. Each SC panel weighs between 12 and 23 metric tonnes. The SC40 scope of supply also includes misc. structural components such as embedment plates, gusset plates, attachment plates, and nuts/washers. The SC40 Shield Building SC Wall Panels scope is classified as Safety Related, Seismic Category I, and Westinghouse Safety Class C. The governing codes and standards include ANSI/AISC N690-1994 and ACI 349-01. 1. Experienced manufacturers / Fabricators capable of fabricating and furnishing AP1000® structural modules and / or Shield Building (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar scopes in large carbon steel fabrication such as sub-modules that are approximately 11.8 m L x 3.1 m W x 1 m T, workshops having >25 tonne crane capacity), stud shooting, welding of ASTM A706 reinforcing steel, welding of high strength carbon steel, and equipment capabilities to roll and handle plate 25.4 mm T x 3.1 m W x 11.8 m L; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with NQA-1 and 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for Units 2 & 3 of the three (3) unit projects. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam but welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 10 hours ago

More from this buyer

Full buyer profile

2 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction materials - Poland

Company Wins Total awarded Last win
METALZBYT-HURT Sp. z o.o. 28 €420,477 Sep 2026
COLAS POLSKA Sp. z o.o. 20 n/a Sep 2026
Bronikowski Paweł PRZEDSIĘBIORSTWO HANDLOWE „SEA” 9 €34,375 Aug 2026
ALSPAW GROUP sp. z o.o. sp. k. 9 n/a Sep 2026
VECO-BET SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ 8 €5.2M Sep 2026

Based on 1008 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction materials
€11,275,833
3,736 open across Europe right now
Buyer track record on Aperlena
18 notices tracked · 0 awarded

Never miss a tender like this

113 new notices in Construction materials in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

15 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language