Polonia - Fabricacion de paneles de pared compuestos de acero y hormigon (SC40) del Shield Building, relacionados con la seguridad, para el proyecto AP 1000 en Polonia - Unidades 2 y 3
OriginalPoland - Structures and parts of structures - Fabrication of AP1000 Safety-Related Shield Building Steel and Concrete Composite (SC) Wall Panels (Commodity Code SC40) for Poland AP 1000® Project - Unit 2 & 3
Procedimiento abiertoCualquier empresa puede presentar oferta, en un solo paso, sin preselección.Entrada completaPor encima del umbral europeoUn contrato lo bastante grande para que se apliquen las normas europeas y deba publicarse en TED.Entrada completa
Código CPVEl vocabulario común de la UE para lo que se compra: un código de ocho cifras que lleva todo anuncio.Entrada completa
Polonia - Fabricacion de paneles de pared compuestos de acero y hormigon (SC40) del Shield Building, relacionados con la seguridad, para el proyecto AP 1000 en Polonia - Unidades 2 y 3
Órgano de contratación: Westinghouse Electric Poland Sp.z.o.o
País: Polonia
Plazo: 13 oct. 2026, 06:59 (UTC+2)
Procedimiento: Procedimiento abierto
Sector (CPV): Materiales de construcción (44210000)
Aperlena: https://aperlena.com/es/t/poland-structures-and-parts-of-structures-fabrication-of-ap1000-safety-related-shield-building-steel-and-concrete-co-ac43c645f8
Anuncio oficial: https://ted.europa.eu/en/notice/-/detail/651178-2026
Si cambia el plazo o se corrige el anuncio, te escribimos.
Iniciar sesión
Publicada
Hoy
Fecha límiteabierta 21 días
Adjudicadapendiente
01
Resumen
Resumen generado automáticamente
Westinghouse busca fabricantes cualificados para fabricar y suministrar paneles de pared SC del Shield Building para el proyecto nuclear AP1000 en Polonia, unidades 2 y 3. El Shield Building rodea el edificio de contencion en la isla nuclear y emplea construccion de placas de acero rellenas de hormigon. El alcance SC40 cubre los paneles cilindricos: 167 paneles por unidad, organizados en 56 grupos unicos, con pesos de 12 a 23 toneladas, chapas de acero de 19,1 a 25,4 mm, barras y placas de amarre y pernos de cortante, ademas de componentes estructurales diversos. Los trabajos se clasifican como relacionados con la seguridad, Seismic Category I, conforme a ANSI/AISC N690-1994 y ACI 349-01. Los interesados deben completar un cuestionario de cualificacion de proveedores AP1000.
02
Descripción
The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rolled carbon steel plates, welded tie bars, welded tie plates, and welded shear studs. Each SC panel weighs between 12 and 23 metric tonnes. The SC40 scope of supply also includes misc. structural components such as embedment plates, gusset plates, attachment plates, and nuts/washers. The SC40 Shield Building SC Wall Panels scope is classified as Safety Related, Seismic Category I, and Westinghouse Safety Class C. The governing codes and standards include ANSI/AISC N690-1994 and ACI 349-01. 1. Experienced manufacturers / Fabricators capable of fabricating and furnishing AP1000® structural modules and / or Shield Building (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar scopes in large carbon steel fabrication such as sub-modules that are approximately 11.8 m L x 3.1 m W x 1 m T, workshops having >25 tonne crane capacity), stud shooting, welding of ASTM A706 reinforcing steel, welding of high strength carbon steel, and equipment capabilities to roll and handle plate 25.4 mm T x 3.1 m W x 11.8 m L; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with NQA-1 and 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for Units 2 & 3 of the three (3) unit projects. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam but welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase. 12. Any companies that do not meet mandatory compliance requirements in section 3 will
Description: The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rolled carbon steel plates, welded tie bars, welded tie plates, and welded shear studs. Each SC panel weighs between 12 and 23 metric tonnes. The SC40 scope of supply also includes misc. structural components such as embedment plates, gusset plates, attachment plates, and nuts/washers. The SC40 Shield Building SC Wall Panels scope is classified as Safety Related, Seismic Category I, and Westinghouse Safety Class C. The governing codes and standards include ANSI/AISC N690-1994 and ACI 349-01. 1. Experienced manufacturers / Fabricators capable of fabricating and furnishing AP1000® structural modules and / or Shield Building (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar scopes in large carbon steel fabrication such as sub-modules that are approximately 11.8 m L x 3.1 m W x 1 m T, workshops having >25 tonne crane capacity), stud shooting, welding of ASTM A706 reinforcing steel, welding of high strength carbon steel, and equipment capabilities to roll and handle plate 25.4 mm T x 3.1 m W x 11.8 m L; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with NQA-1 and 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for Units 2 & 3 of the three (3) unit projects. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam but welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase.
¿Puedo presentarme?
Procedimiento abierto: cualquier proveedor interesado puede presentar oferta. Por encima del umbral europeo: abierta a empresas de cualquier país de la UE.