Aller au contenu
Aperlena

Pologne - Fabrication de panneaux muraux composites acier-beton (SC40) du Shield Building, lies a la surete, pour le projet AP 1000 en Pologne - Unites 2 et 3

Original Poland - Structures and parts of structures - Fabrication of AP1000 Safety-Related Shield Building Steel and Concrete Composite (SC) Wall Panels (Commodity Code SC40) for Poland AP 1000® Project - Unit 2 & 3

Ouvert Avis de marché 16 jours restants
Suivre ce marché

Date limite le 13 oct.. Si elle bouge, un e-mail quand le registre le voit. Un rectificatif : le même e-mail. Votre plan : décider avant le 29 sept., questions avant le 29 sept., offre rédigée avant le 6 oct.. Se connecter

  1. Publié
  2. Aujourd'hui
  3. Date limite ouvert 21 jours
  4. Attribué en attente

Résumé

Résumé généré automatiquement

Westinghouse recherche des fabricants qualifies pour fabriquer et fournir des panneaux muraux SC du Shield Building pour le projet nucleaire AP1000 en Pologne, unites 2 et 3. Le Shield Building entoure le batiment de confinement dans l'ile nucleaire et utilise une construction en plaques d'acier remplies de beton. Le lot SC40 couvre les panneaux muraux cylindriques : 167 panneaux par unite, ranges en 56 groupes uniques, pesant de 12 a 23 tonnes, avec des toles d'acier de 19,1 a 25,4 mm, des barres et plaques d'attache et des goujons de cisaillement, plus des composants structurels divers. Les travaux sont classes lies a la surete, Seismic Category I, selon ANSI/AISC N690-1994 et ACI 349-01. Les candidats doivent remplir un questionnaire de qualification fournisseur AP1000.

Description

The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rolled carbon steel plates, welded tie bars, welded tie plates, and welded shear studs. Each SC panel weighs between 12 and 23 metric tonnes. The SC40 scope of supply also includes misc. structural components such as embedment plates, gusset plates, attachment plates, and nuts/washers. The SC40 Shield Building SC Wall Panels scope is classified as Safety Related, Seismic Category I, and Westinghouse Safety Class C. The governing codes and standards include ANSI/AISC N690-1994 and ACI 349-01. 1. Experienced manufacturers / Fabricators capable of fabricating and furnishing AP1000® structural modules and / or Shield Building (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar scopes in large carbon steel fabrication such as sub-modules that are approximately 11.8 m L x 3.1 m W x 1 m T, workshops having >25 tonne crane capacity), stud shooting, welding of ASTM A706 reinforcing steel, welding of high strength carbon steel, and equipment capabilities to roll and handle plate 25.4 mm T x 3.1 m W x 11.8 m L; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with NQA-1 and 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for Units 2 & 3 of the three (3) unit projects. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam but welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase. 12. Any companies that do not meet mandatory compliance requirements in section 3 will Description: The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rolled carbon steel plates, welded tie bars, welded tie plates, and welded shear studs. Each SC panel weighs between 12 and 23 metric tonnes. The SC40 scope of supply also includes misc. structural components such as embedment plates, gusset plates, attachment plates, and nuts/washers. The SC40 Shield Building SC Wall Panels scope is classified as Safety Related, Seismic Category I, and Westinghouse Safety Class C. The governing codes and standards include ANSI/AISC N690-1994 and ACI 349-01. 1. Experienced manufacturers / Fabricators capable of fabricating and furnishing AP1000® structural modules and / or Shield Building (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar scopes in large carbon steel fabrication such as sub-modules that are approximately 11.8 m L x 3.1 m W x 1 m T, workshops having >25 tonne crane capacity), stud shooting, welding of ASTM A706 reinforcing steel, welding of high strength carbon steel, and equipment capabilities to roll and handle plate 25.4 mm T x 3.1 m W x 11.8 m L; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with NQA-1 and 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for Units 2 & 3 of the three (3) unit projects. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam but welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 17 heures

Plus de cet acheteur

Profil complet de l'acheteur

2 marchés ouverts actuellement

Cet acheteur n'a encore aucune attribution enregistrée dans ce secteur. Attributaires habituels, Matériaux de construction - Pologne

Entreprise Attributions Montant total attribué Dernière attribution
METALZBYT-HURT Sp. z o.o. 28 420 477 € sept. 2026
COLAS POLSKA Sp. z o.o. 20 n/d sept. 2026
Bronikowski Paweł PRZEDSIĘBIORSTWO HANDLOWE „SEA” 9 34 375 € août 2026
ALSPAW GROUP sp. z o.o. sp. k. 9 n/d sept. 2026
VECO-BET SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ 8 €5,2M sept. 2026

Sur la base de 1007 attributions avec un profil d'entreprise associé au cours des 2 dernières années.

Marchés similaires

Contexte de marché

Appel ouvert moyen · Matériaux de construction
11 068 092 €
3 851 ouverts en Europe actuellement
Historique de l'acheteur sur Aperlena
18 avis suivis · 0 attribués

Ne manquez plus aucun marché comme celui-ci

110 nouveaux avis pour Matériaux de construction en Pologne au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

16 jours restants

Source

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer