Skip to content
Aperlena

Poland - Building construction work - CWS Circulating Water Pumps (Concrete Volute)

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

This tender covers the design, supply of materials, fabrication, testing and delivery of nine vertical concrete volute pumps for the Poland AP100 nuclear power plant project, covering three planned units (3 x 33% per unit). The pumps will move brackish Baltic Sea water in a once-through cooling system, with a rated flow of 21.3 m3/s, pump head of 22.5 m and a 60-year design life. Physical model testing and shop performance testing are required. Pre-qualification is forecast for September 2026, RFQ issuance November 2026, proposals due January 2027 and award April 2027, with Unit 1 required onsite in June 2032. All dates are forecasts and subject to change.

Description

The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Deadline (Pre-qualification Submittal): September 2026 (Forecast - Subject to change) RFQ Document Issuance: November 2026 (Forecast - Subject to change) Supplier Proposals Due: January 2027 (Forecast - Subject to change) Order Award Date: April 2027 (Forecast - Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required Onsite Date: Unit 1: June 2032 (Forecast - Subject to change) Unit 2 & 3 will be further detailed in the RFQ package.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

9 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Poland

Company Wins Total awarded Last win
Strabag Sp. z o.o. 212 €575.5M Sep 2026
Przedsiębiorstwo Robót Drogowych Sp. z o.o. 90 €4.7M Sep 2026
COLAS POLSKA Sp. z o.o. 72 €8.5M Sep 2026
Eurovia Polska S.A. 60 €27.6M Sep 2026
Przedsiębiorstwo Robót Drogowych Lubartów S.A. 59 €1.1M Sep 2026

Based on 23499 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€32,211,727
30,085 open across Europe right now
Buyer track record on Aperlena
12 notices tracked · 0 awarded

Never miss a tender like this

2,367 new notices in Construction work in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close