Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 1 week ago Prior information notice

Austria - Civil engineering works, other than tunnels, shafts and subways - 142204_A00 VBA Upper Austria Renovation_Civil Engineering

Original Österreich - Tiefbauarbeiten, außer Tunneln, Schächten und Unterführungen - 142204_A00 VBA OOE Sanierung_Tiefbau

Closed Austria Construction work

Buyer Autobahnen- und Schnellstraßen- Finanzierungs-Aktiengesellschaft

Key facts

Published
  1. Published
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

Civil engineering works for the renovation, adaptation and new construction of the existing traffic control system (VBA) in Upper Austria and the WWW sites. The works comprise civil engineering services as part of the modernisation. The renovation area covers the following motorway sections: A01 from km 154,000 to km 179,500, A01 from km 193,000 to km 199,000, A01 from km 231,500 to km 242,500, A07 from km 0,000 to km 27,000, A08 from km 0,000 to km 15,500, A09 from km 0,000 to km 2,000 and A25 from km 0,000 to km 18,5. The works take place in Austria.

Description

Die gegenständlichen Baumaßnahmen (Ausschreibung) umfassen im Wesentlichen die Leistungen TIEFBAU bei der Sanierung, Adaptierung sowie Neubau der bestehenden Verkehrsbeeinflussungsanlage (VBA) Oberösterreich sowie der WWW-Standorte. Das Sanierungsgebiet erstreckt sich dabei auf folgende Streckenabschnitte: A01 km 154,000 bis km 179,500 A01 km 193,000 bis 199,000 A01 km 231,500 bis km 242,500 A07 km 0,000 bis km 27,000 A08 km 0,000 bis km 15,500 A09 km 0,000 bis km 2,000 A25 km 0,000 bis km 18,5

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 week ago

Autobahnen- und Schnellstraßen- Finanzierungs-Aktiengesellschaft

Austria

notices in the register
1,065
awards
282
awarded in total
€10.1B

Who wins its contracts

Many suppliers
different companies won its awards
189
of the awards went to the three most frequent winners
10%
of its calls state an estimated value
1%

Based on 259 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
5.0
of those lots received a single tender
4%
of the awards went to companies based in another country
3%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Awards most often to

  1. PORR Bau GmbH 11 awards €130.5M
  2. Schimetta Consult Ziviltechniker GmbH 9 awards €3.6M
  3. STRABAG AG 7 awards €97.3M

19 open tenders right now

Market context

open now in Construction work
20,149
median open notice
€549,804

Who wins in this market

Many suppliers

Austria · Construction work

different companies won awards here
1,244
of the awards went to the three most frequent winners
8%
winners of the last 12 months were new here
989 of 1,111
buyers awarded contracts here
327

Based on 2,523 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners. New: no award from the same buyer or market in the two years before.

Competition

tenders per lot on average (open and restricted procedures)
5.4
of those lots received a single tender
10%
of the awards went to companies based in another country
2%
of the tenders came from another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

192 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Underground work other than tunnels, shafts and subways: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language