Skip to content
Aperlena

Norway - Construction work for health buildings - Invitation to supplier seminar New Security Post Valen Helse Fonna HF

Original Norway - Construction work for buildings relating to health - Invitation to supplier seminar New Security Post Valen Helse Fonna HF

Upcoming Prior information notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Helse Fonna HF in Norway is planning a new security psychiatry post at Valen and is inviting suppliers to a seminar. The need arises because more people are sentenced to forced mental health care than are discharged, increasing demand for security places at local and regional levels. The current facility is inadequate: premises are too small, causing conflicts between functions, there are no patient baths, too few screening rooms, unsuitable access and reception areas, and no zone division. New buildings, outdoor areas and technology should improve quality, patient and employee safety, and enable zoning for women and patients with different needs.

Description

The need for security psychiatry in the health company/development perspectiveOverordna plan for Security Psychiatry in Norway points to an increase in the number of sentenced to forced mental health care also on timed judgements. More new judgements will be handed down than the number of sentences ceased. There is therefore an increased need for security places at both local and regional levels in the work with security psychiatry in Norway.The current Security Post is characterised by inappropriate systems connected to area, security measures, buildings and outside areas. It is for small premises to necessary functions so that concurrency conflicts occur. There is a lack of patient baths and too few and different screening rooms set up against the need. Access and reception rooms are inappropriate, and there is a lack and inadequate screened outside area on the same level. In the current area, the zone division does not exist. There is an increasing need to be able to divide into zones with, among other things, being able to divide into periods when women also have in the department or have patients with different screening needs connected to noise and impressions. New areas will facilitate buildings, areas and technology that can contribute to increased quality, patient safety and safety for both employees and patients.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

85 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Norway

Company Wins Total awarded Last win
Veidekke Industri AS 13 €54.3M Apr 2026
NCC Industry 6 €21.7M Apr 2026
HENT AS 5 €343.7M Apr 2026
AF Gruppen Norge AS 4 €641.9M Sep 2026
Norsk Teknisk Installasjon AS 4 €86.0M Jul 2026

Based on 222 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,608,317
25,884 open across Europe right now
Buyer track record on Aperlena
775 notices tracked · 161 awarded
€170,986,269 in awarded contracts

Never miss a tender like this

72 new notices in Construction work in Norway in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close