Machine-generated summary

Vindafjord municipality in Norway announces an upcoming tender for the construction of a new water and sewage pipeline between Skjold and Vats. The contract covers approx. 1.2 km of PE 315 mm pipe from Krakk to Knapphus, of which approx. 750 m is on land and the rest lies in Røyravatnet lake, including approx. 450 m of PE SESU 315 mm pipe laid in the lake. The work is demanding and requires experience and competence, with at least 80% of the work to be carried out by skilled workers. The competition will be published on 1 June with a short tender deadline. A site inspection takes place on route on 02.06.2026 at 12:00. No estimated value is stated.

Description

announcement of the coming competition. This competition will be published 1 June. The tender deadline will be short. There is a site inspection on route 02.06.2026, 12:00. Vindafjord municipality shall construct a new water and sewage service between Skjold and Vats. Parts of this have now been completed for a stretch between Solheim and Krakk. A facility of approx. 1.2 km of PE 315 mm leased from Krakk to Knapphus shall now be constructed. Approx. 750 m of these are on land. Resterande in the lake. A new water and sewage system has been engineered for drinking water with manholes and drainage. The bumps and amounts are being developed by Cowi Haugesund. The initiative is construction searches. Approx. 450 m of PE SESU 315 mm shall be loaded in Røyravatnet. This is seen as a demanding case for both experience and competence. The edge zone around the lake is swampy with sore abilities. The Botn conditions are lause and have very good ability. It can be deceiving to have boats set out on the lake due to the age-appropriate lending ́s waterside. Parts of the lake are edifice in the beach. May have to use cranes to launch boats with. Excavating and laying hire can be degrading near and in the edge zone due to folly matter and bad ability. May need to consider long excavators or other permits here. New leased and kummar shall be put on frost free djupna. Water and sewage norm and water and sewage norm for Vindafjord debt for the assignment. At least 80% of the work shall be carried out by skilled workers. Ground surveys and car laying of Røyravatnet have been carried out. It sights breeding in the northern part of the lake. The contracting route must therefore be altered slightly. Noko, which means that the welded at bend 3 on the leased section and the leased service must be accurately loaded in routes. Gps measurements are required when laying the leidninga in the lake. There may be mountains in part of the route. Then it can host blasting/chiselling. In pricing the tenders, the contractor must take a high so that this can happen. There are adjustable postage for blasting and chiselling. The contracting authority shall place the contract in the tractor road, box and border. There will be contact with drainage that lies in roads and ekre. The contractor must skate and take care of in a good way. There are adjustable items for this. Work hosted in development class 3 water supply and sewage installations. The work will require a certified enterprise classification. Central approval or equivalent must be enclosed with the tender. The work required experience with laying pe water treatment in the sea or lake. Documentation must be enclosed from projects on laying of PE 315 mm or greater during the last 5 years. The road down from the E134 and down into the yard shall be set to stand and asphalted. The downward road shall be set and gravelasted up. The ekrer shall be set to stand after the work has ended. The measure require signage on both the E134 and county road 46. It hosts the contractor's job to apply and arrange this. The contracting authority has made a contract with the founding authorities. Contractors must familiarise themselves with the desse and conditions to them in their work and completion. The work will be carried out during the growth season. But the farmer must have the opportunity to silo balls and anna on the real estate. The contractor must facilitate this for. Work will be invoiced in accordance with used time. Invoices shall be sent to the builder at the end of the contract period. There are eigne reglars for invoices. Invoice reglar. 4 types: Månadsfaktura, EA/EO invoice, disputed invoice and final invoice. EA/EO shall on an eign invoice. The amount to which the tenderer shall withdraw and send the invoice shall be issued. The final invoice shall throw more with that text. The work shall be carried out in accordance with the builder ́s assignments and described. The tender documentation, documents and NS 3420 shall form the basis for pricing. The builder cannot offer storage/barracks place. Contractors must arrange this themselves. The final documentation and final invoice shall be delivered by the end of 2026. QUALIFICATION REQUIREMENTS • Tenderers shall be a legally established company register. • Tenderers must have good economic and financial capacity to fulfil the contract. • Tenderers shall have a good and well-functioning quality assurance system adapted to the delivery. • Tenderers shall have relevant experience from assignments or deliveries of equivalent nature and extent to the assignment in question. Added at least éin PE 315 mm water hire in the last 5 years. • Development class 3 for water supply and sewage installations.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

This buyer has no award history in this sector yet. Usual winners, Construction work - Norway

Company Wins Total awarded Last win
Veidekke Industri AS 13 €54.3M Apr 2026
NCC Industry 6 €21.7M Apr 2026
HENT AS 5 €343.7M Apr 2026
AF Gruppen Norge AS 4 €641.9M Sep 2026
Norsk Teknisk Installasjon AS 4 €86.0M Jul 2026

Based on 219 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€32,015,646
30,074 open across Europe right now
Buyer track record on Aperlena
3 notices tracked · 0 awarded

Never miss a tender like this

72 new notices in Construction work in Norway in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close