Awarded to
- Awarded value
- €446,000
- Bid received
- 1 A single tender
- Record with this buyer
- 13 contracts from this buyer in the register, €38.2M in total
Summary
Machine-generated summaryRijkswaterstaat Programma's, Projecten en Onderhoud awarded a contract for the design, manufacture and installation of boarding aids at the Volkeraksluizencomplex. The main contract concerns multi-year maintenance of the Volkeraksluizencomplex and the Haringvlietsluizen, which are crucial for the flood defences in the Netherlands, protecting the surrounding land against flooding. The work keeps the locks compliant with applicable safety standards and functional requirements. Vialis B.V. won the contract for EUR 446,000. The contract has been awarded and the procurement is completed.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 day ago
What this buyer has paid before
Based on 54 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €446,000
- Median award
- €8.6M
- Middle half of past awards
- €341,631 to €21.8M
The award sits inside the usual range.
Most recent awards
- Nederland - Waterbouwwerkzaamheden - 31215827: Herhalingsopdracht Houtribcomplex €250,000,000
- Nederland - Onderhoud van hoogwaterkeringen - 31203739 Conserveren Oosterscheldekering €51,397,545
- Nederland - Werkzaamheden voor hoogwaterpreventie - 31208914 Renovatie Bewegingswerken Oosterscheldekering - FASE 2A
- Nederland - Volledige of gedeeltelijke bouw- en civieltechnische werkzaamheden - 31204979 Onderhoudscontract Verdiepte ligging Groningen 2026 - 2031 €5,169,821
- Nederland - Werkzaamheden ter voorkoming van strandafslag - 31205037 voor het engineeren en uitvoeren van suppletiewerken langs de Nederlandse kust €16,302,000
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileRijkswaterstaat Programma's, Projecten en Onderhoud
- notices in the register
- 795
- awards
- 108
- awarded in total
- €21.3B
Who wins its contracts
Many suppliers- different companies won its awards
- 61
- of the awards went to the three most frequent winners
- 23%
- of its calls state an estimated value
- 4%
Based on 87 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 2.8
- of those lots received a single tender
- 15%
- of the awards went to companies based in another country
- 5%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
41 open tenders right now
- Ship operation services - 31217007 Supply of food and technical and non-technical ship supplies for the State Fleet 10 days left
- Services for the provision of personnel, including temporary staff - 31212654 for hiring nautical personnel RR, VWM 10 days left
- Supervision of construction works - Framework agreement for direction and supervision for the national Facade Insulation project 20 days left
Market context
- open now in Construction work
- 28,842
- median open notice
- €831,890
Who wins in this market
Many suppliersNetherlands · Construction work
- different companies won awards here
- 490
- of the awards went to the three most frequent winners
- 6%
- buyers awarded contracts here
- 292
Based on 738 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.5
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 1%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
1,233 new notices in Construction work in Netherlands in the last 7 days. Get an email when new ones appear. Free.
Set up my alert