Skip to content
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) verified 44 minutes ago Contract notice

Nederland - Modulaire verplaatsbare bouwelementen - Landelijk - Modulaire en Circulair Railgebonden Gebouwen

Open Netherlands Construction materials

Buyer ProRail B.V.

30 days left

Key facts

Closes
12:00 (UTC+1)
Procedure
Open procedure
  1. Published
  2. Today
  3. Deadline open for 30 days
  4. Awarded pending

Bidding window

29 days from publication to deadline

Shorter than usual

Notices of this kind (Netherlands, open procedure, above the EU threshold) give a median of 47 days, half of them between 39 and 60 days, based on 10,660 notices of the last two years. Fewer days than three in four comparable notices. Check the documents early and ask questions before the clarification deadline.

This buyer usually gives 48 days (median of its last 83 calls for tender).

View the official notice Watch this tender

If the deadline moves or the notice is corrected, we email you. Log in

Description

ProRail heeft behoefte aan ​levering​ van modulaire en circulaire railgebonden gebouwen (RGG’s), bestaande uit gestandaardiseerde modules die worden ingezet voor het huisvesten van spoorgebonden technische installaties (onder andere energievoorziening, treinbeveiliging en telecom/ICT) binnen de assets van ProRail. Deze modules dienen bij te dragen aan een toekomstbestendige en duurzame inrichting van het spoor, waarbij standaardisatie, circulariteit en flexibiliteit centraal staan. Het doel van deze aanbesteding is om met één partij een raamovereenkomst te sluiten betreffende de levering, het vullen met technische systemen, het opslaan, reviseren en demonteren van modulaire railgebonden gebouwen om invulling te geven aan deze behoefte. Het maximumaantal af te nemen systemen (modules) bedraagt 270 stuks.

Terms of the procedure

How tenders are scored
Inschrijfsom: 0 points; Kwaliteit: Ketensamenwerking: 20 points

As the official notice states them.

Bid or no-bid?

Six questions before you commit a team. Under each one, what the register holds on it. The answers are yours.

  1. In your favour:

    Do we meet every eligibility criterion?

    Open procedure: any interested supplier may submit a bid.

    Above the EU threshold: open to companies from any EU country.

  2. Your call:

    Can we deliver this with the team we have?

    The register holds nothing on this. The official documents will.

  3. Your call:

    Do we have two comparable references?

    Comparable work is in Construction materials.

  4. In your favour:

    Is the deadline realistic for a proper offer?

    30 days left, 22 of them working days.

  5. Your call:

    Is there a margin at the likely winning price?

    In this country this kind of contract is usually awarded for between €400,000 and €1.6M.

  6. Your call:

    Do we know this buyer?

    The buyer has 290 notices in the register and no pattern of winners yet.

Can I bid?

  • Open procedure: any interested supplier may submit a bid. Above the EU threshold: open to companies from any EU country.
  • The notice is written in Dutch.
  • Certificates from another EU country? Check the equivalents on eCertis

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Report an error in this notice

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 44 minutes ago

What this market pays

The buyer has too few awards of its own in this sector, so this is the range of the last 55 awards for Construction materials in Netherlands.

Median award
€747,400
Middle half of past awards
€400,000 to €1.6M

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it has no mark on the scale. The official documents may state one.

Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.

ProRail B.V.

Netherlands

notices in the register
290
awards
144
awarded in total
€777.4M

Who wins its contracts

Many suppliers
different companies won its awards
73
of the awards went to the three most frequent winners
18%
of its calls state an estimated value
23%

Based on 99 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
2.7
of those lots received a single tender
24%
of the awards went to companies based in another country
7%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.

This buyer has no award history in this sector yet. Usual winners, Construction materials - Netherlands

Company Wins Total awarded Last win
Otolift Trapliften B.V. 10 €3,320 Aug 2026
Lasaulec B.V. 7 €7.8M Jul 2026
Daiwa House Modular Europe Jan Snel B.V. 6 €9.3M Sep 2026
Aebi Schmidt Nederland B.V. 4 €487,976 Apr 2026
Envicon B.V. 3 €2.3M Apr 2026

Based on 137 awards with a linked company profile over the last 2 years.

27 open tenders right now

Market context

TED - Tenders Electronic Daily (Publications Office of the EU) publishes no value for this notice, so it cannot be placed among the open notices of its sector. The official documents may state one.

open now in Construction materials
3,638
median open notice
€80,000

Who wins in this market

Many suppliers

Netherlands · Construction materials

different companies won awards here
96
of the awards went to the three most frequent winners
17%
buyers awarded contracts here
104

Based on 137 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
2.7
of those lots received a single tender
18%
of the awards went to companies based in another country
5%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Similar tenders

Open now

Awarded before

Never miss a tender like this

5 new notices in Construction materials in Netherlands in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Modular and portable buildings: an email when new tenders arrive under it, no account needed.

30 days left

Open notice

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language