Skip to content
Aperlena

simap.ch - Swiss public procurement platform verified 2 months ago Contract notice

N02 Second Gotthard Tube (North Tube and Airolo Gallery) and N2 Renovation of the First Gotthard Tube (South Tube), Lot 1305 - LV Cabling and Earthing

Original N02, Secondo tubo San Gottardo (2TG Röhre Nord und Galleria di Airolo) und N2 Risanamento primo tubo San Gottardo (1TG Röhre Süd) Los 1305 - Verkabelung NS und Erdung

Closed Switzerland Construction work

Buyer Bundesamt für Strassen ASTRA -Abteilung Strasseninfrastruktur-Ost - F3 Zofingen

Key facts

Closed
23:59 (UTC+2)
Procedure
Open procedure
  1. Published
  2. Deadline was
  3. Deadline open for 45 days
  4. Awarded pending
View the official notice Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

Summary

Machine-generated summary

The Federal Roads Office ASTRA procured the supply and installation of low-voltage cables and earthing cables from the LV transformers to the main distribution boards of the normal and emergency power networks, as part of lot 1305. The work supports the upgrading of the roughly 17 km long Gotthard road tunnel, where a second tube, called the North tube, is being equipped between 2027 and 2030, together with the roughly 1 km long Airolo gallery. The existing South tube is to be renovated between 2030 and 2033, with new equipment running until around 2036. The tender was closed for bids, with a bid deadline of 25 September 2026.

Description

Um die Sanierung des bestehenden - rund 17 km langen - Gotthard Strassentunnels zu ermöglichen, haben sich Bundesrat, Parlament und Bevölkerung für den Bau einer zweiten Röhre entschieden. Die BSA-Ausrüstung der zweiten Röhre, als Röhre Nord bezeichnet, erfolgt in den Jahren 2027 bis 2030, teilweise parallel zur Fertigstellung der baulichen Arbeiten. Parallel zur Nordröhre wird auch die Galleria di Airolo (GdA) mit einer Länge von rund 1 km realisiert, die einen integralen Bestandteil des Gotthardsystems bildet. Umgehend nach der Eröffnung der Röhre Nord im Gegenverkehrsbetrieb, erfolgt die Erneuerung der Bestandsröhre, die als Röhre Süd bezeichnet wird. Die bauliche Sanierung ist in den Jahren 2030 bis 2033 terminiert. Die bestehende BSA-Ausrüstung der Röhre Süd wird aufgrund ihres Alters komplett zurückgebaut. Die BSA-Neuausrüstung erfolgt teils parallel zum verkehrlichen Betrieb und dauern voraussichtlich bis 2036. Im Endzustand wird der GTG im Richtungsverkehr (pro Röhre ein Fahrstreifen plus Pannenstreifen) mit einer Geschwindigkeit von 80 km/h betrieben. Eine Sperrung einer Röhre wird aber aus Wartungs- und Ereignisgründen immer wieder vorkommen.   Das vorliegende Los umfasst: Die Lieferung und Verlegung der NS-Kabel und Erdungskabel von den MS/NS-Transformatoren bis zu den Hauptverteilern des Normal- und Notstromnetzes.

Official source

Source: simap.ch - Swiss public procurement platform

Always verify details on the official notice.

This is not an official publication. The data published on the www.simap.ch platform are authoritative.

Report an error in this notice

Last verified against simap.ch - Swiss public procurement platform 2 months ago

Bundesamt für Strassen ASTRA -Abteilung Strasseninfrastruktur-Ost - F3 Zofingen

Switzerland

notices in the register
36
awards
9

Who wins its contracts

of its calls state an estimated value
0%

17 open tenders right now

Market context

open now in Construction work
19,895
median open notice
€564,516

Who wins in this market

Many suppliers

Switzerland · Construction work

different companies won awards here
1,447
of the awards went to the three most frequent winners
2%
buyers awarded contracts here
561

Based on 2,833 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.

Competition

tenders per lot on average (open and restricted procedures)
4.4
of those lots received a single tender
8%
of the awards went to companies based in another country
1%
of the tenders came from another country
0%

As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Read before bidding
    Submission deadline
    Was: August 31, 2026, 19:59
    Now: September 25, 2026, 21:59 26 days later

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Open now

Awarded before

Never miss a tender like this

314 new notices in Construction work in Switzerland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Or follow just its CPV code, Electrical wiring work: an email when new tenders arrive under it, no account needed.

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
o
Open the result in a new tab
x
Set this result aside
/
Search from any page
Ctrl K
Search from any page
?
Show these shortcuts
Esc
Close

Index

Close
Log in

Language